Summary
Work includes 150 LF pipe removed, 24" and under; 2 EA manhole abandoned; 1 LS pump station abandoned, complete; 1,050 LF fill and plug existing conduit, 10" conduit; 230 SF 4" concrete walk; 410 SY aggregate drive; 80 SY concrete drive apron, 8" thick; 20,000 SY topsoil furnished and placed and seeding and mulching; 30 LF 12" conduit w/ structural backfill (odot type b); 137 LF 24" steel pipe encasement, bored and jacked; 4,270 LF 14" PVC sanitary force main, open cut; 4 EA manhole, odot no. 3; 30,000 EA railroad flagging and inspection services; 4,270 LF conduit, misc. : 14" PVC sanitary force main, directionally bore (add/deduct from open cut item).