Closing soon

Town of Wardensville Splash Pad RFP

Description: Construct and install the splash pad and appurtenances. The contractor will be responsible for a turnkey delivery of the splash pad project to consist of the following: five (5) above ground features all with powder coated stainless steel posts. Four (4) below ground spray features. All fixtures are to have a stainless-steel base - limited fiberglass fixtures /components and no fixtures that hold water. Furnish and install electronics package with timer and activation post. One (1) electronic water management system (manifold, activation post and electronics). Flow-through water system, compliant with WV bureau for public health regulations. Construct 25' x 36' concrete slab at 3,500 psi using #3 rebar space d 12" OC. Slab is to be broom finished, non -slip, ADA compliant with zero depth surfacing. Two (2) 12" x 12" drains to be furnished and installed in the concrete slab to create positive drainage for the splash pad. One (1) in ground manifold with solenoid pressure with PVC or Pex connections furnished and installed from the features to the splash pad. Gauge installed in yard valve box to be set directly outside of splash pad concrete slab. Construct a 5' -0" concrete sidewalk border all around the splash pad concrete slab with a broom finish to be designated for equipment/pump housing. Delivery and mobilization.

Buyer
Town of Wardensville

City · WV, US

Released
Nov 8, 2026
Closes
Dec 4, 2026(11 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts