CityTX
Aug 3, 2026
Closes
Aug 25, 2026
3rd Street Culvert Replacement
3rd Street Culvert Replacement.
Description: Work includes 55 SY sawcut and remove existing ac pavement; 47 LF sawcut and remove existing concrete curb and gutter; 128 LF remove and replace existing chain link fence and gate in kind; 2 EA remove existing flared end section and dispose of properly; 141 LF remove existing cmp pipe and dispose of properly; 1 LS remove existing concrete pieces and dispose of properly; 151 LF 40"x65" rcp arch pipe with structural support; 2 EA reshape existing earthen ditch at new end section; 55 SY prepare subgrade and install 6" thick pccp. See outside link.
City · CO, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
CityTX
Aug 3, 2026
Closes
Aug 25, 2026
3rd Street Culvert Replacement.
CityTX
-
Closes
Aug 20, 2026
Work includes existing collapsed culvert is an 18" reinforced concrete pipe approx 352'; the flow line depth at the western manhole is 5.67' and the flow line depth on the eastern manhole is 9. 45'; inlets on the eastern end of the project have flow lines of 4. 30' and 4.33' per the city's gis storm sewer mapping; cctv inspection revealed a 5' x 6' surface sinkhole has formed or is forming; 24" reinforced concrete pipe draining to the northeast; other 18" reinforced concrete pipes outside of the manholes on the western end are in good condition; approximately 24' in length asphalt pavement is anticipated. See attached file.
CityBC
-
Closes
Aug 26, 2026
The City of Port Moody is seeking a qualified contractor for RFP26-20, Vintner Street Storm Culvert Replacement, to supply and install a 450mm diameter storm culvert on Vintner Street. The posting identifies the opportunity as an open RFP for construction work, with a scope consisting of the culvert, a storm headwall with trash screen, and riprapping, and it contains no grant-program description. The official portal shows the closing time as Wed Aug 26, 2026 2:00 PM (PDT); it does not provide a bidding-start time or a direct PDF, DOCX, or PPT file URL.
CityGA
Aug 3, 2026
Closes
Sep 8, 2026
Installation of approx 2,300 LF of 6" water main pipe along street. The water main will connect to existing water mains. Cap existing 2" water main along street and abandon in place. Installation of water service laterals and make connection to 44 existing water meters; removal and replacement of existing pavement sections impacted by construction activities; installation of a new asphaltic concrete overlay along street; miscellaneous task such as excavation, backfilling, traffic control, and any other necessary work to complete the project. 50 LF 4" sewer lateral replacement, 100 LF 12" bituminous coated steel casing, 1 LS 2" water main plug and abandon, 20 SY sidewalk, erosion control, 200 SY grassing, fertilizing and mulching.
Procurement and program contacts connected to Town of Eaton.