CityNY
Jul 17, 2026
Closes
Sep 8, 2026
2026 Town Hall Planning Services (RFP)
Project includes planning firms to prepare a site plan for a new Town Hall.
Description: Replace the existing main lift station generator with a new emergency standby generator that will serve the lift station. Improvements include the removal and replacement of the existing onsite diesel genset with a 100 kw diesel generator with subbase fuel tank. Additional equipment removal and replacement includes disconnect switches, automatic transfer switches, transformers, pullboxes, conduit, and feeders for a complete and functional system. Site improvements include concrete sidewalk and pavement removal and replacement, concrete generator pad extension, and site restoration.
City · IN, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityNY
Jul 17, 2026
Closes
Sep 8, 2026
Project includes planning firms to prepare a site plan for a new Town Hall.
CityNY
Jun 23, 2026
Closes
Sep 8, 2026
Project includes licensed architectural firms to prepare plans for a new Town Hall.
CityON
Aug 19, 2026
Closes
Sep 24, 2026
The Town of Saugeen Shores is requesting a professional Prime Consultant to review previously developed master plans and recommend modifications aligned with the updated project program. The consultant must develop the project within the budget approved by Council, including engineering design and phasing to achieve all deliverables. The posting is classified as a Services RFP rather than a grant program, includes a mandatory site visit at 201 High Street Southampton (Town Hall), and closes Thu Sep 24, 2026 2:00 PM (EDT).
CityNY
Aug 27, 2026
Closes
Sep 16, 2026
Work include Contract No. 2 Mechanical Construction: The work shall include providing all labor, materials and equipment, and other means of construction necessary and incidental to the removal and salvaging of existing hot water radiators, reinstallation of the hot water radiators, hot water supply and return piping, single zone mini split system with indoor units and an outdoor unit, and refrigerant piping. Contract No. 3 Plumbing Construction: The work shall include providing all labor, materials and equipment, and other means of construction necessary and incidental for the roof drains and installation of roof drain piping
Decision makers connected to this RFP from Town of Clear Lake.