Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 3,800 SY of pavement milling, approx 450 TN of hot mix asphalt surface paving, 8,250 SF of concrete sidewalk, 5,500 SF of existing sidewalk removal, 17 TN of aggregate transitioning, seed & mulching disturbed areas, traffic maintenance, and miscellaneous work
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Pierre is soliciting sealed bids for the 2026 Street Paving Project to perform street paving work within Pierre, South Dakota. Bidding opened on 2025-12-25 and closes on 2026-01-15; solicitation documents and plan-holder registration are available from the City of Pierre’s bid posting (the City requires submission of a plan-holders form to access full documents). This is a construction/works procurement (not a grant) issued by the City of Pierre (Hughes County, SD, US).
Posted Date
Dec 25, 2025
Due Date
Jan 15, 2026
Release: Dec 25, 2025
Close: Jan 15, 2026
The City of Pierre is soliciting sealed bids for the 2026 Street Paving Project to perform street paving work within Pierre, South Dakota. Bidding opened on 2025-12-25 and closes on 2026-01-15; solicitation documents and plan-holder registration are available from the City of Pierre’s bid posting (the City requires submission of a plan-holders form to access full documents). This is a construction/works procurement (not a grant) issued by the City of Pierre (Hughes County, SD, US).
AvailableWork includes approx 3,945 SY of pavement milling, 55 TN of hot mix wedging, 130 TN of bituminous base paving, and 535 TN of hot mix bituminous surface paving, 17 TN of #73 aggregate, traffic maintenance, and miscellaneous work to complete the project.
Posted Date
Dec 18, 2025
Due Date
Jan 5, 2026
Release: Dec 18, 2025
Close: Jan 5, 2026
Work includes approx 3,945 SY of pavement milling, 55 TN of hot mix wedging, 130 TN of bituminous base paving, and 535 TN of hot mix bituminous surface paving, 17 TN of #73 aggregate, traffic maintenance, and miscellaneous work to complete the project.
AvailableProvide planing (1"-2"), paving, striping, and traffic control markings. Drainage improvements on four of the streets are also included.
Posted Date
Dec 29, 2025
Due Date
Jan 20, 2026
Release: Dec 29, 2025
Close: Jan 20, 2026
Provide planing (1"-2"), paving, striping, and traffic control markings. Drainage improvements on four of the streets are also included.
AvailableThe work includes demolition of street which is an existing one-way asphalt road; widening of the road to improve it for two-way traffic; installing new base and pavement section; and installing new storm drainage pipes and structures within the city right-of-way and easements as described in these contract documents. Specifically, street which is approx. 13' +/- wide (width varies) will be demolished to earth subgrade which includes asphalt pavement, base materials, and any additional subgrade earth materials as required to meet the proposed elevations for the new pavement section described in these documents and as illustrated on the drawings. Contractor shall grade and widen the proposed two-way road to 26' wide from back of curb to back of curb.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
The work includes demolition of street which is an existing one-way asphalt road; widening of the road to improve it for two-way traffic; installing new base and pavement section; and installing new storm drainage pipes and structures within the city right-of-way and easements as described in these contract documents. Specifically, street which is approx. 13' +/- wide (width varies) will be demolished to earth subgrade which includes asphalt pavement, base materials, and any additional subgrade earth materials as required to meet the proposed elevations for the new pavement section described in these documents and as illustrated on the drawings. Contractor shall grade and widen the proposed two-way road to 26' wide from back of curb to back of curb.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →