Closed

Tower Inspection and Engineering Evaluation of a Rohn Model 80 Series RFP

Description: Contractor is to provide a detailed report of the inspection to include photographic evidence of the structure. Reporting shall include an Inspection and Engineering Evaluation and remediation/ repairs quote based on the inspection findings. 1. The tower inspection and engineering evaluation will be conducted for a Class III, Public Safety Critical tower. 2. The tower inspection and engineering evaluation will follow ANSI/TIA-222-I (or higher) guidelines, Motorola R56 guidelines. 3. The contractor will reference manufacturer guidance on tower maintenance. Available historical documentation will be provided by the Contracting Officer’s Representative (COR). 4. The contractor will coordinate with the COR on inspection dates and times. See attached file.

Released
Aug 19, 2026
Closes
Aug 21, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts