Closing soon

Toutant Beauregard Rd. Water Main and Wurzbach Rd. Swing Tie Project

Description: The construction of approximately 30 LF of 6', 48 LF of 8', 2,370 LF of 12', 6,953 LF of 16', and 10 LF of 24' DI pipe via open cut, 1,043 LF of 24' to 30' steel casing installed by jacking or boring, surface restoration including pavement replacement, and all other associated appurtenances. proposal includes the construction of approx 55 LF of 24-inch DI pipe via open cut for the construction of the swing-tie connection from the existing 42” CSC water main located along Wurzbach Parkway to the existing 24” CSC water main located along Evers Road to facilitate maintenance and construction at the Wurzbach Pump Station and Storage Tanks for the Wurzbach Pump Station Valve/Swing Tie Projec

Buyer
San Antonio Water System

SpecialDistrict · TX, US

Released
Jul 25, 2026
Closes
Aug 26, 2026(9 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts