Closing soon

TIRZ 25 - West Fuqua Street Sidewalk Maintenance

Description: The project scope includes the removal and replacement of existing concrete sidewalks, curb ramps, driveways, and curbs as identified by the engineer in the field; trimming of trees and/or shrubs within the right-of-way; installation of imprinted sidewalk poetry as identified in the project manual; traffic control; sw3p measures; and tree protection

Buyer
Released
-
Closes
Sep 21, 2026(8 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts