FederalOK
Jul 22, 2026
Closes
Aug 31, 2026
Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501
Accomplish the demo and replacement of the industrial waste lift stations (IWLS) 6N and 6S. Work includes removing the existing stations, installing new lift station equipment and valve vaults, and connecting them to the existing industrial waste system. Mechanical upgrades include a new wet well, new submersible pumps, containment piping, and improved screening to manage future flows, and maintenance needs. Site grading and drainage improvements will support the new installation. Electrical upgrades will include new controls, power improvements, and integration with the base monitoring system. Construction will be sequenced to keep one lift station in service at all times and minimize disruptions.