City of Indianapolis
Drainage improvements project.
City of Weldon Spring
Installation of piped drainage underneath a sidewalk. The work shall include: Removal, or saw cuts, of sidewalk slabs, and proper disposal. Installation of new underground piping beneath the adjacent sidewalk that connects via “boot” to downspouts, and directs water to a suitable discharge point, such as a storm sewer or daylight. Restoration of disturbed surfaces, including concrete and landscaping. Underground piping: [e.g., Schedule 40 PVC or SDR-35, minimum 4" diameter, with proper slope and cleanouts if required]. All work must comply with local stormwater and building codes. Contractor is responsible for all permits, inspections, and utility locates.
City of Quincy
Drainage Improvements.
Coahoma County
Drainage improvements: 1. Removal and replacement of inlet drainage structures 2. Removal and replacement of concrete pipe and/or approved equal pipe materials 3. Removal and replacement of curb and gutter 4. Removal and replacement of asphalt pavement 5. Rehabilitation of soil, landscape, and grass at each inlet location 6. Removal and replacement of various city signs, i. E: stop, street, yield, etc
Release
Sep 19, 2025
Close
Nov 06, 2025