Summary
Seeking proposal for thorn ditch flood mitigation project. Tree removal (6 to 15 units dia) 617 unit, (tree removal over 15 units dia) 986 unit, tree trunk protection 20 EA, earth excavation 38800, aggregate sub grade improvement 50 CU YD, removal and disposal of unsuitable material 50 CU YD, exploration trench 84" depth 92', Portland cement concrete sidewalk 5" 1420' SQ, pavement removal 610 SQ YD, combination curb and gutter removal 350', removal of existing structure. Precast concrete concrete box culverts 7'x7' 856', precast concrete concrete box culverts 10'x7' 184', structure excavation 43299 CU YD, granular backfill for structure 8 CU YD, concrete sealer. See attached file