The resurfacing on I-40 from near the Foothills Parkway (L.M. 13.67) to the bridge over the Pigeon River (L.M. 15.05). Project Length - 1.380 miles
Description: The contract covers I-40 resurfacing from near the Foothills Parkway (L.M. 13.67) to the bridge over the Pigeon River (L.M. 15.05), a 1.380-mile project (Contract No. CN261068, Call No. 012; Project No. NH-I-40-8(196), PIN 135275.00). It also includes resurfacing from near MM 440 (L.M. 15.16) to the North Carolina state line (L.M. 21.92), a 6.760-mile segment, for a combined contract length of 8.140 miles. TDOT specifies completion on or before June 15, 2028.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Procurement is for a bridge-deck replacement over Massey Creek near Cleveland, covering 0.142 miles of improvement. The listing's AI overview says a bid bond is required. The solicitation number, full technical description, and documents are not publicly visible on the page.
The selected consultant will provide design and plan-development services for construction documents covering a bridge-deck overlay at Dandy Trail Bridge over I-74 and two bridge replacements: US 136 over Eagle Creek and the westbound bridge over I-865. Required services include environmental documentation, permits, public involvement and meetings, topographic survey, bridge design, utility coordination, hydraulic analysis and design, traffic management planning, and construction-phase services. INDOT will provide geotechnical services and pavement designs; wetland mitigation, archaeological and historical/architectural investigations, and subsurface utility engineering may be added if needed.
DPDaniel PallmeAssistant Bureau Chief of Passenger Transportation, Rail & Freight
*******@************
This Request for Qualifications (RFQ) seeks a design-build contractor for the Lower Brownsville Road, Bridge over I-40 design-build project, which involves the replacement of the existing bridge.