Pennsylvania Department of Transportation
State AgencyPA
Aug 24, 2026
Closes
Sep 17, 2026
Franklin Rd Over Strickler Run RFP
Work include 1,227 CY class 1 excavation; 1,710 SY subbase 6" depth (no. 2a); 1,512 SY superpave asphalt mixture design, wearing course; 4,466 SY asphalt tack coat; 535 SY milling of asphalt pavement surface, 2" depth, milled material retained by contractor; 366 LF 6" pavement base drain; 325 LF type 31-s guide rail with 7' extra length posts; 2,800 LF 4" standard pavement markings, paint & beads, yellow; 2,800 LF 4" standard pavement markings, paint & beads, white; 81 LF remove existing bridge railing (department property). See outside link for more.