Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD, providing demolition and repair of existing docks and walks and installation of wave attenuator.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
DESIGN-BUILD services for site evaluation, design, installation, operation and maintenance of the solar for all program.
Posted Date
Dec 5, 2025
Due Date
Jan 12, 2026
Release: Dec 5, 2025
Close: Jan 12, 2026
DESIGN-BUILD services for site evaluation, design, installation, operation and maintenance of the solar for all program.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Clearwater, Public Works, is soliciting bids for the replacement of four floating wave attenuators at Clearwater Harbor Marina. The project scope includes constructing one finger pier, installing electrical and mechanical utilities, and replacing cable connections within the floating dock. The work involves demolishing existing attenuators, mooring piles, and finger piers, followed by new construction using steel pipe piles and concrete elements, along with related utilities as detailed in the engineering documents. This municipal construction solicitation has an estimated value range of $500,000 to $1,500,000.
Posted Date
Dec 10, 2025
Due Date
Feb 4, 2026
Release: Dec 10, 2025
Close: Feb 4, 2026
The City of Clearwater, Public Works, is soliciting bids for the replacement of four floating wave attenuators at Clearwater Harbor Marina. The project scope includes constructing one finger pier, installing electrical and mechanical utilities, and replacing cable connections within the floating dock. The work involves demolishing existing attenuators, mooring piles, and finger piers, followed by new construction using steel pipe piles and concrete elements, along with related utilities as detailed in the engineering documents. This municipal construction solicitation has an estimated value range of $500,000 to $1,500,000.
AvailableThe City of Clearwater (Public Works) is soliciting bids for a municipal construction project at Clearwater Harbor Marina. The scope of work includes replacing four floating wave attenuators, constructing one finger pier, installing electrical and mechanical utilities, and replacing cable connections within the floating dock. The project involves demolition of existing attenuators, mooring piles, and finger piers, followed by new construction using steel pipe piles and concrete elements, along with related utilities as specified in the engineering documents. The estimated value range for this solicitation is $500,000 - $1,500,000.
Posted Date
Dec 10, 2025
Due Date
Feb 4, 2026
Release: Dec 10, 2025
Close: Feb 4, 2026
The City of Clearwater (Public Works) is soliciting bids for a municipal construction project at Clearwater Harbor Marina. The scope of work includes replacing four floating wave attenuators, constructing one finger pier, installing electrical and mechanical utilities, and replacing cable connections within the floating dock. The project involves demolition of existing attenuators, mooring piles, and finger piers, followed by new construction using steel pipe piles and concrete elements, along with related utilities as specified in the engineering documents. The estimated value range for this solicitation is $500,000 - $1,500,000.
AvailableDesign-Build: provide architectural, engineering, and construction services to complete a full interior renovation.
Posted Date
Dec 17, 2025
Due Date
Dec 29, 2025
Release: Dec 17, 2025
Close: Dec 29, 2025
Design-Build: provide architectural, engineering, and construction services to complete a full interior renovation.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →