Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Carrollton, GA solicits sealed proposals for construction of infrastructure improvements to support The Collective Off Rome Townhome Development, including demolition and removal of existing storm and sanitary sewer networks and installation of storm sewer (~1,900 LF), sanitary sewer (~1,343 LF), and public water main (~1,633 LF) with hydrants and service lines. The work covers two new local streets connecting W. White St and Abby Lane in Carrollton, GA; contractors must coordinate with the Project Engineer and City Engineer. Proposals are due January 29, 2026 and require a 5% bid bond and 100% performance and payment bonds from the successful bidder.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Demolition and removal of existing public sewer main and storm drainage networks, and the proposed improvements include storm sewer, sanitary sewer, and water utility infrastructure. The demolition and removal of storm sewer networks consist of approx. 201 LF of pipe and 3 structures. The installation of proposed storm sewer networks consists of approx. 1,900 LF of pipe, and 27 structures. The demolition and removal of sanitary sewer networks consist of approx. 1,207 LF of pipe and 4 structures. The installation of sanitary sewer networks consists of approx. 1,343 LF of pipe and 10 structures. The installation of public water main consists of approximately 1633 LF of pipe, 4 fire hydrants, and 56 water service lines and meters. Erosion, Sedimentation and Pollution control measures must be implemented, maintained, and removed post-installation.
Posted Date
Nov 21, 2025
Due Date
Jan 29, 2026
Release: Nov 21, 2025
Close: Jan 29, 2026
Demolition and removal of existing public sewer main and storm drainage networks, and the proposed improvements include storm sewer, sanitary sewer, and water utility infrastructure. The demolition and removal of storm sewer networks consist of approx. 201 LF of pipe and 3 structures. The installation of proposed storm sewer networks consists of approx. 1,900 LF of pipe, and 27 structures. The demolition and removal of sanitary sewer networks consist of approx. 1,207 LF of pipe and 4 structures. The installation of sanitary sewer networks consists of approx. 1,343 LF of pipe and 10 structures. The installation of public water main consists of approximately 1633 LF of pipe, 4 fire hydrants, and 56 water service lines and meters. Erosion, Sedimentation and Pollution control measures must be implemented, maintained, and removed post-installation.
AvailableThe Collective at Morning Vista is a mixed-use development project located in Lehi, Utah at Highway 92 and Morning Vista Road. This comprehensive development comprises four primary buildings (Buildings A, B, C, and D) with an extensive sitework package covering 23 acres. Building A is a 35,500 square-foot anchor grocer facility featuring complete shell construction with specialized systems including dedicated HVAC designed for food retail operations, refrigeration support infrastructure, and equipment platforms. Building B (21,881 SF), Building C (30,384 SF), and Building D (27,832 SF) comprise of retail and restaurant shell space, each requiring core and shell construction to allow for future tenant improvements.
Posted Date
Dec 15, 2025
Due Date
Jan 14, 2026
Release: Dec 15, 2025
Close: Jan 14, 2026
The Collective at Morning Vista is a mixed-use development project located in Lehi, Utah at Highway 92 and Morning Vista Road. This comprehensive development comprises four primary buildings (Buildings A, B, C, and D) with an extensive sitework package covering 23 acres. Building A is a 35,500 square-foot anchor grocer facility featuring complete shell construction with specialized systems including dedicated HVAC designed for food retail operations, refrigeration support infrastructure, and equipment platforms. Building B (21,881 SF), Building C (30,384 SF), and Building D (27,832 SF) comprise of retail and restaurant shell space, each requiring core and shell construction to allow for future tenant improvements.
DESIGN-BUILD - Encompasses design, construction management, construction, and potentially financing of new infrastructure associated with a new retail development, including new roadway for access, as well as storm sewer, sanitary sewer, and water main extensions.
Posted Date
Dec 23, 2025
Due Date
Jan 16, 2026
Release: Dec 23, 2025
Close: Jan 16, 2026
DESIGN-BUILD - Encompasses design, construction management, construction, and potentially financing of new infrastructure associated with a new retail development, including new roadway for access, as well as storm sewer, sanitary sewer, and water main extensions.
AvailableThe City of Melbourne Airport Authority is soliciting sealed bids for the Northside Expansion Infrastructure Development at Melbourne Orlando International Airport, including clearing vegetation (except trees over 4" diameter except palms), grading a fence line, furnishing and installing 6,700 linear feet of 7' tall chain link fence with barbed wire, and three 16' single swing gates. A non-mandatory pre-bid site visit is allowed and a pre-bid meeting is scheduled for 2025-12-18 at 10:00 AM in the MAA Board Room. Bids open 2025-12-09 and are due 2026-01-20 at 2:00 PM Eastern (2026-01-20T19:00:00Z); the solicitation is an Invitation to Bid (not a grant) and is currently open.
Posted Date
Dec 10, 2025
Due Date
Jan 20, 2026
Release: Dec 10, 2025
Close: Jan 20, 2026
The City of Melbourne Airport Authority is soliciting sealed bids for the Northside Expansion Infrastructure Development at Melbourne Orlando International Airport, including clearing vegetation (except trees over 4" diameter except palms), grading a fence line, furnishing and installing 6,700 linear feet of 7' tall chain link fence with barbed wire, and three 16' single swing gates. A non-mandatory pre-bid site visit is allowed and a pre-bid meeting is scheduled for 2025-12-18 at 10:00 AM in the MAA Board Room. Bids open 2025-12-09 and are due 2026-01-20 at 2:00 PM Eastern (2026-01-20T19:00:00Z); the solicitation is an Invitation to Bid (not a grant) and is currently open.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis