White River Planning and Development District
Special DistrictAR
Posted
-
Sep 17, 2026
Closure of White River Recycling & Reclamation Class 3T Landfill
work consist of site preparation, vegetation removal, tree removal, 14,714 cy of clay liner (includes excavation, loading, hauling and placement), 4,905 cy of top soil, 6.08 acres seeding and mulching, 3030 cy of remove and relocate excessive soil/tires down to sub-grade elevation, 900 cy of construct settling pond bemn, 80 cy of B-stone (rock check dams), 2510 lf of 40 mil VLDPE/diversion perimeter ditch liner includes excavation and regrading/shaping and anchoring, .