Closing soon

TFS Building 2 Window Replacement RFP

Description: Project scope includes UB Building 2 is a two-story manufacturing facility with a mechanical penthouse. The project replaces the existing curtain wall around the areas identified on the architectural and structural drawings. The existing system has deteriorated framing, seals, and glazing alignment. The work is intended to provide a safe, weather-tight enclosure and meet the design and code criteria stated in the project documents.

Released
Oct 23, 2026
Closes
Nov 9, 2026(4 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts