Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Teton County (WY) is soliciting proposals to install a solar array on the roof of the Teton County Recreation Center at 220 North King Street, Jackson, WY. The work includes furnishing all labor, materials, and equipment necessary per the RFP documents; vendors must obtain the RFP package and submit proposals via Public Purchase (Bid ID 207284) or deliver sealed bids to Teton County General Services. A mandatory pre-bid conference is scheduled for December 19, 2025 at 12:00 PM, and all proposals are due by 10:00 AM MST on December 29, 2025.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
DPR Construction, on behalf of Teton County, WY, is soliciting bids for multiple scopes for the Teton County Justice Center in Jackson, Wyoming. The project includes demolition of the existing courthouse and detention facility, rerouting utilities, and construction of new courtrooms, detention facilities, offices, meeting spaces, and sheriff department areas. Bid documents are available via BuildingConnected beginning December 8, 2025; questions are due December 19, 2025 at noon local time, and bids are due January 7, 2026 at noon local time.
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
DPR Construction, on behalf of Teton County, WY, is soliciting bids for multiple scopes for the Teton County Justice Center in Jackson, Wyoming. The project includes demolition of the existing courthouse and detention facility, rerouting utilities, and construction of new courtrooms, detention facilities, offices, meeting spaces, and sheriff department areas. Bid documents are available via BuildingConnected beginning December 8, 2025; questions are due December 19, 2025 at noon local time, and bids are due January 7, 2026 at noon local time.
Premium
Access the largest public sector contact database
Work includes design, engineer, build, operate and maintain a turn-key installation of a rooftop solar pv project.
Posted Date
Nov 20, 2025
Due Date
Jan 14, 2026
Release: Nov 20, 2025
Close: Jan 14, 2026
Work includes design, engineer, build, operate and maintain a turn-key installation of a rooftop solar pv project.
AvailableRelease: Dec 11, 2025
Close: Jan 8, 2026
Solar project.
AvailableSeeking private company for site selection, design, building, operation, maintenance and eventual decommissioning of solar photovoltaic systems on county owned properties.
Posted Date
Dec 5, 2025
Due Date
Dec 31, 2025
Release: Dec 5, 2025
Close: Dec 31, 2025
Seeking private company for site selection, design, building, operation, maintenance and eventual decommissioning of solar photovoltaic systems on county owned properties.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis