Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking private company for site selection, design, building, operation, maintenance and eventual decommissioning of solar photovoltaic systems on county owned properties.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of solar project with solar panels on a 384-acre site at the far eastern edge of Fayette County, on the border of Clark County. The farm is projected to generate 40 megawatts of power, or enough to power about 4,558 homes, according to estimates from cooperative officials. Cooperative Solar Farm Two - Fayette will feature photovoltaic (PV) solar panels mounted on single-axis tracking systems supported by steel posts. When operating, the solar panels will move to track the sun from east to west over the course of the day. The solar farm will have capacity to generate 40 megawatts of electricity at alternating current (AC). That is enough to serve the annual electricity needs of 4,560 typical Kentucky homes.
Posted Date
-
Due Date
Dec 29, 2025
Premium
Access the largest public sector contact database
Close: Dec 29, 2025
Construction of solar project with solar panels on a 384-acre site at the far eastern edge of Fayette County, on the border of Clark County. The farm is projected to generate 40 megawatts of power, or enough to power about 4,558 homes, according to estimates from cooperative officials. Cooperative Solar Farm Two - Fayette will feature photovoltaic (PV) solar panels mounted on single-axis tracking systems supported by steel posts. When operating, the solar panels will move to track the sun from east to west over the course of the day. The solar farm will have capacity to generate 40 megawatts of electricity at alternating current (AC). That is enough to serve the annual electricity needs of 4,560 typical Kentucky homes.
AvailableSeeking solar energy developers for solar photovoltaic systems.
Posted Date
Nov 9, 2025
Due Date
Jan 13, 2026
Release: Nov 9, 2025
Close: Jan 13, 2026
Seeking solar energy developers for solar photovoltaic systems.
AvailableThe City of Detroit (OCP on behalf of DPW City Engineering Division) issued an RFI seeking information on construction project management and accounting software tailored for road and bridge projects, including features like pay estimate generation, inspector daily reports, contract modifications, and integration with MERL. The RFI is for information-gathering only (not a solicitation or guarantee of award) and requests implementation, integration, pricing for a minimum five-year period, references, and potential product demonstrations; responses are due 2026-01-07.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
The City of Detroit (OCP on behalf of DPW City Engineering Division) issued an RFI seeking information on construction project management and accounting software tailored for road and bridge projects, including features like pay estimate generation, inspector daily reports, contract modifications, and integration with MERL. The RFI is for information-gathering only (not a solicitation or guarantee of award) and requests implementation, integration, pricing for a minimum five-year period, references, and potential product demonstrations; responses are due 2026-01-07.
AvailableThe Los Angeles Department of Water and Power (LADWP) issued an RFI requesting information from parties experienced in planning, design, and deployment of renewable and/or Distributed Energy Resources (DERs). This posting is a re-advertisement of a prior RFI (04.29.2019-POWER-JRD); respondents who previously submitted need not resubmit but may provide additional information.
Posted Date
Oct 31, 2019
Due Date
Jan 2, 2030
Release: Oct 31, 2019
Close: Jan 2, 2030
The Los Angeles Department of Water and Power (LADWP) issued an RFI requesting information from parties experienced in planning, design, and deployment of renewable and/or Distributed Energy Resources (DERs). This posting is a re-advertisement of a prior RFI (04.29.2019-POWER-JRD); respondents who previously submitted need not resubmit but may provide additional information.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis