Terminal Roof and AHU Replacements

Description: Work includes 2,000 LF remove 1/2"-2" abandoned electrical conduit and wire; 1,000 LF remove 2-4" abandoned electrical conduit and wire; 1,000 LF remove and replace 1/2"-2" electrical conduit and wire; 500 LF remove and replace 2 1/2"-4" electrical conduit and wire; 5 EA remove 575-640 ton chiller (west plant); 4 ea remove 750 ton chiller (east plant); 50 unit (3'x10' section each) remove and replace roof decking (3' x 10'); 4,000 BF remove and replace wood blocking; 25 unit (100sf each) wire brush and paint decking (100sf). See attached file.

Buyer
Released
Jul 17, 2026
Closes
Aug 25, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.