Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement and installation of aluminum curtain wall and storefront systems.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Renovate 12 terminal restrooms (men's and women's) at the secured and unsecured sections of Lihue Airport. Renovation to include replacement of various finishes, toilet accessories, plumbing and electrical fixtures for a complete refresh of the terminal restrooms.
Posted Date
Jan 5, 2026
Due Date
Feb 19, 2026
Release: Jan 5, 2026
Close: Feb 19, 2026
Renovate 12 terminal restrooms (men's and women's) at the secured and unsecured sections of Lihue Airport. Renovation to include replacement of various finishes, toilet accessories, plumbing and electrical fixtures for a complete refresh of the terminal restrooms.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of uniformly raising the elevation of the existing 26-acre concrete parking lot by approx. 3'. Work includes breaking and processing the existing concrete pavement in place, placing structural fill to achieve the required elevation, constructing Fabriform slope protection along the perimeter tie-ins, installing new asphalt pavement over the raised site, applying pavement striping, and implementing all required erosion and sediment control measures, including ongoing monitoring.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Work consists of uniformly raising the elevation of the existing 26-acre concrete parking lot by approx. 3'. Work includes breaking and processing the existing concrete pavement in place, placing structural fill to achieve the required elevation, constructing Fabriform slope protection along the perimeter tie-ins, installing new asphalt pavement over the raised site, applying pavement striping, and implementing all required erosion and sediment control measures, including ongoing monitoring.
AvailableProvide design-build services for the airline terminal project.
Posted Date
Dec 31, 2025
Due Date
Jan 27, 2026
Release: Dec 31, 2025
Close: Jan 27, 2026
Provide design-build services for the airline terminal project.
AvailableThe scope of work is to demolish and rebuild most of the interior southeast corner of the terminal building at the port regional airport. Existing walls, plumbing, electrical, etc., will be removed.
Posted Date
Dec 16, 2025
Due Date
Jan 27, 2026
Release: Dec 16, 2025
Close: Jan 27, 2026
The scope of work is to demolish and rebuild most of the interior southeast corner of the terminal building at the port regional airport. Existing walls, plumbing, electrical, etc., will be removed.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →