Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Menominee County
The contractor shall provide all necessary materials, supplies, & equipment and perform all necessary services to replace the roofs on both defined work areas, including but not limited to: Removing the existing stone, roof and ballast as necessary; Remove several existing vents that are no longer necessary; Determine if bead insulation is necessary for proper drainage; Install 4" of insulation; Install fully adhered .060 EPDM roof system or equivalent; Ensure proper drainage; Secure all necessary permits. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
North Carolina A T State University
Partial roof replacement project of building. .
Posted Date
Nov 13, 2025
Due Date
Dec 12, 2025
Release: Nov 13, 2025
North Carolina A T State University
Close: Dec 12, 2025
Partial roof replacement project of building. .
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Davis
The work shall include providing a roof overlay by installing new insulation and a new membrane over the existing roof. The project also consists of replacing downspouts, installing new roof access ladders, and replacing three rooftop HVAC units in kind with the required structural reinforcement.
Posted Date
Sep 26, 2025
Due Date
Dec 10, 2025
Release: Sep 26, 2025
City of Davis
Close: Dec 10, 2025
The work shall include providing a roof overlay by installing new insulation and a new membrane over the existing roof. The project also consists of replacing downspouts, installing new roof access ladders, and replacing three rooftop HVAC units in kind with the required structural reinforcement.
AvailableMenominee Area Public Schools
Roof replacement project. Work includes complete removal of existing single ply and coal tar pitch built-up roof systems, asbestos abatement, new insulation and roof system, new steel framing with new metal wall cladding.
Posted Date
Nov 24, 2025
Due Date
Dec 8, 2025
Release: Nov 24, 2025
Menominee Area Public Schools
Close: Dec 8, 2025
Roof replacement project. Work includes complete removal of existing single ply and coal tar pitch built-up roof systems, asbestos abatement, new insulation and roof system, new steel framing with new metal wall cladding.
AvailableYes Prep Public Schools Inc
Re-Roof replacement.
Posted Date
Nov 17, 2025
Due Date
Dec 8, 2025
Release: Nov 17, 2025
Yes Prep Public Schools Inc
Close: Dec 8, 2025
Re-Roof replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →