County Of Menominee
The contractor shall provide all necessary materials, supplies, & equipment and perform all necessary services to replace the roofs on both defined work areas, including but not limited to: Removing the existing stone, roof and ballast as necessary; Remove several existing vents that are no longer necessary; Determine if bead insulation is necessary for proper drainage; Install 4" of insulation; Install fully adhered .060 EPDM roof system or equivalent; Ensure proper drainage; Secure all necessary permits. See attached file.
rfp_fy2025-1_-_airport_terminal_building_roof
Release
Oct 01, 2024
Close
Oct 17, 2024