Summary
Work consists of the complete removal of all EIFS siding and sheathing down to the wood studs/CMU as well as construction of new sheathing, insulation, weather barrier and fiber cement siding for both buildings (2206 and 2210). New gutters and downspouts. Existing windows and storefront to be replaced with new aluminum storefront. Existing roofing and hollow metal doors and frames shall remain. Existing HVAC units at grade shall be disconnected for demo and reconnected for construction. Surrounding stone and grade around buildings shall be removed and replaced. Existing sidewalks at the building entrances shall be removed and replaced to facilitate the work. See outside link.