Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Sentara
Project consists of the building addition of approx 1,305 SF to Sentara Albemarle Medical Center including the build-out of a new outpatient pharmacy.
Posted Date
Feb 7, 2026
Due Date
Feb 26, 2026
Release: Feb 7, 2026
Sentara
Close: Feb 26, 2026
Project consists of the building addition of approx 1,305 SF to Sentara Albemarle Medical Center including the build-out of a new outpatient pharmacy.
AvailableSentara
Work consists of the complete removal of all EIFS siding and sheathing down to the wood studs/CMU as well as construction of new sheathing, insulation, weather barrier and fiber cement siding for both buildings (2206 and 2210). New gutters and downspouts. Existing windows and storefront to be replaced with new aluminum storefront. Existing roofing and hollow metal doors and frames shall remain. Existing HVAC units at grade shall be disconnected for demo and reconnected for construction. Surrounding stone and grade around buildings shall be removed and replaced. Existing sidewalks at the building entrances shall be removed and replaced to facilitate the work. See outside link.
Posted Date
-
Due Date
Jul 21, 2025
Sentara
Close: Jul 21, 2025
Work consists of the complete removal of all EIFS siding and sheathing down to the wood studs/CMU as well as construction of new sheathing, insulation, weather barrier and fiber cement siding for both buildings (2206 and 2210). New gutters and downspouts. Existing windows and storefront to be replaced with new aluminum storefront. Existing roofing and hollow metal doors and frames shall remain. Existing HVAC units at grade shall be disconnected for demo and reconnected for construction. Surrounding stone and grade around buildings shall be removed and replaced. Existing sidewalks at the building entrances shall be removed and replaced to facilitate the work. See outside link.
Sentara
Project consists of general construction including plumbing, mechanical and electrical.
Posted Date
May 6, 2025
Due Date
Jun 3, 2025
Release: May 6, 2025
Sentara
Close: Jun 3, 2025
Project consists of general construction including plumbing, mechanical and electrical.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Sentara's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Sentara's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database