Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking a contract to purchase one (1) Bunkhouse Trailer. This trailer shall be utilized during emergencies/disasters in assisting emergency responders in all regions of the State.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The U.S. Department of Agriculture, Forest Service (Flathead National Forest) issued RFQ 1240LU26Q0007 for maintenance repairs to the Condon Bunkhouse, covering repainting and repairs to floors, walls, and ceilings in two bunkhouses and one residence. The procurement is a total small business set-aside with estimated construction magnitude between $100,000 and $250,000, and includes multiple attachments on SAM.gov (statement of work, solicitation terms, drawings/photos, wage determination, schedule of items, past performance questionnaire). Offers are due Jan 29, 2026 at 4:00 PM MST.
Posted Date
Jan 5, 2026
Due Date
Jan 29, 2026
Release: Jan 5, 2026
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Department of Agriculture, Forest Service (Flathead National Forest) issued RFQ 1240LU26Q0007 for maintenance repairs to the Condon Bunkhouse, covering repainting and repairs to floors, walls, and ceilings in two bunkhouses and one residence. The procurement is a total small business set-aside with estimated construction magnitude between $100,000 and $250,000, and includes multiple attachments on SAM.gov (statement of work, solicitation terms, drawings/photos, wage determination, schedule of items, past performance questionnaire). Offers are due Jan 29, 2026 at 4:00 PM MST.
AvailableThe USDA Forest Service is soliciting firm-fixed-price quotes for the Strawberry–Kamas Bunkhouse Renovations project on the Uinta/Wasatch/Cache National Forest, involving demolition, construction, and remodeling of multiple bunkhouses, residences, and a mess hall across two project sites. The procurement is a Request for Quotation under Commercial Item procedures, set aside 100% for Small Business, with an estimated contract value of $500,000 to $1,000,000 and an approximate work start date of February 15, 2026. A site visit is planned and full solicitation documents and response instructions are available from the original SAM.gov posting.
Posted Date
-
Due Date
Jan 26, 2026
Release: -
Close: Jan 26, 2026
The USDA Forest Service is soliciting firm-fixed-price quotes for the Strawberry–Kamas Bunkhouse Renovations project on the Uinta/Wasatch/Cache National Forest, involving demolition, construction, and remodeling of multiple bunkhouses, residences, and a mess hall across two project sites. The procurement is a Request for Quotation under Commercial Item procedures, set aside 100% for Small Business, with an estimated contract value of $500,000 to $1,000,000 and an approximate work start date of February 15, 2026. A site visit is planned and full solicitation documents and response instructions are available from the original SAM.gov posting.
AvailableThe contractor shall: inspect and verify existing roof conditions prior to starting work. Remove or repair damaged roofing materials as needed. Repair or replace roofing components affected by normal wear and tear. Clean and repair gutters, ensuring full drainage function. Clean, inspect, and repair roof vents. Disassemble rooftop solar panels as needed to access roofing surface underneath. Reassemble and reinstall solar panels with proper electrical reconnection and safety checks. Repair or replace damaged insulation beneath roofing material. Inspect, repair and/or replace insulation material and secure vent holes on second floor administrative site. Provide all necessary tools, materials, safety equipment, and waste disposal containers. Remove and properly dispose of all debris generated by the work. Conduct a final inspection and ensure area is fully cleaned before project completion.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
The contractor shall: inspect and verify existing roof conditions prior to starting work. Remove or repair damaged roofing materials as needed. Repair or replace roofing components affected by normal wear and tear. Clean and repair gutters, ensuring full drainage function. Clean, inspect, and repair roof vents. Disassemble rooftop solar panels as needed to access roofing surface underneath. Reassemble and reinstall solar panels with proper electrical reconnection and safety checks. Repair or replace damaged insulation beneath roofing material. Inspect, repair and/or replace insulation material and secure vent holes on second floor administrative site. Provide all necessary tools, materials, safety equipment, and waste disposal containers. Remove and properly dispose of all debris generated by the work. Conduct a final inspection and ensure area is fully cleaned before project completion.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →