Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The contractor shall: inspect and verify existing roof conditions prior to starting work. Remove or repair damaged roofing materials as needed. Repair or replace roofing components affected by normal wear and tear. Clean and repair gutters, ensuring full drainage function. Clean, inspect, and repair roof vents. Disassemble rooftop solar panels as needed to access roofing surface underneath. Reassemble and reinstall solar panels with proper electrical reconnection and safety checks. Repair or replace damaged insulation beneath roofing material. Inspect, repair and/or replace insulation material and secure vent holes on second floor administrative site. Provide all necessary tools, materials, safety equipment, and waste disposal containers. Remove and properly dispose of all debris generated by the work. Conduct a final inspection and ensure area is fully cleaned before project completion.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Admin site-window replacement. Requires the overhaul and replacement of existing window systems in nine (9) nearly identical two-story government quarters elevated on pilings.
Posted Date
Dec 18, 2025
Due Date
Mar 5, 2026
Release: Dec 18, 2025
Close: Mar 5, 2026
Admin site-window replacement. Requires the overhaul and replacement of existing window systems in nine (9) nearly identical two-story government quarters elevated on pilings.
AvailableRoof replacement at lake city scattered.
Posted Date
Dec 9, 2025
Due Date
Jan 20, 2026
Release: Dec 9, 2025
Close: Jan 20, 2026
Roof replacement at lake city scattered.
Available2026 roof replacement.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
2026 roof replacement.
AvailableProvide roof replacement services.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Provide roof replacement services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis