Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Teaching & Research Greenhouses MERT Improvements. Project involves retrofitting the two existing Teaching and Research Greenhouses to support the Experimental Mesocosm Research and Training (MERT) program focused on sediment remediation. Within the greenhouses, the work will include adding a containment curb, filling gaps in the existing concrete slabs, and leveling and sealing the slab surfaces. Portions of the siding in both greenhouses will be removed as part of the retrofit. The scope also includes installing utility sinks that will pump to an aboveground storage tank, as well as updating the electrical system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The University of Minnesota is soliciting a general contractor to provide construction services for partial HVAC upgrades at the Poultry Teaching and Research Facility, including reuse of existing rooftop units, replacement of other units, ductwork, electrical updates, and fire suppression work. The project will be procured as a fixed lump-sum contract with expected substantial completion by September 30, 2026 and a ~9 month project duration. A mandatory pre-bid/pre-proposal meeting is scheduled and proposals will be evaluated on qualifications, approach and cost.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
The University of Minnesota is soliciting a general contractor to provide construction services for partial HVAC upgrades at the Poultry Teaching and Research Facility, including reuse of existing rooftop units, replacement of other units, ductwork, electrical updates, and fire suppression work. The project will be procured as a fixed lump-sum contract with expected substantial completion by September 30, 2026 and a ~9 month project duration. A mandatory pre-bid/pre-proposal meeting is scheduled and proposals will be evaluated on qualifications, approach and cost.
AvailableSingle bid package to include: general trades, plumbing, and electrical for the construction of two new greenhouses.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Single bid package to include: general trades, plumbing, and electrical for the construction of two new greenhouses.
AvailableProvide construction services for HVAC upgrades: upgrade and improve the building infrastructure HVAC systems by reutilizing existing roof top units (RTU) and replacing other RTU with new systems and ductwork; remove existing roofing and replace with new insulation and 4-ply built-up roof system. Provide structural enhancements for HVAC RTU support. Replace all roof drains and splash pads, parapet walls, and roof access stairway; update and improve associated, general building electrical systems and services including replacing the existing electrical room door and adding an additional egress door from the electrical room. Lighting and ceiling fan replacements in poultry holding rooms where hvac system replacements are occurring only all other rooms will retain existing lighting and fans. See outside link.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Work consists of the construction of MALSF system improvements and rail improvements includes approach lighting system improvements.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Work consists of the construction of MALSF system improvements and rail improvements includes approach lighting system improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction services for HVAC upgrades: upgrade and improve the building infrastructure HVAC systems by reutilizing existing roof top units (RTU) and replacing other RTU with new systems and ductwork; remove existing roofing and replace with new insulation and 4-ply built-up roof system. Provide structural enhancements for HVAC RTU support. Replace all roof drains and splash pads, parapet walls, and roof access stairway; update and improve associated, general building electrical systems and services including replacing the existing electrical room door and adding an additional egress door from the electrical room. Lighting and ceiling fan replacements in poultry holding rooms where hvac system replacements are occurring only all other rooms will retain existing lighting and fans. See outside link.
Available