Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes but is not limited to: new flooring, paint, and acoustical wall panels. AUM requests alternate bid pricing for replacing ceiling baffles, painting ceiling and exposed duct work, and new lighting fixtures.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Renovation (replacement of) title flooring through the building, interior painting and renovation of men's, women's and staff restrooms at cove senior center. Removal of old light fixtures and replacement of new LED light fixtures.
Posted Date
Jan 14, 2026
Due Date
Feb 3, 2026
Release: Jan 14, 2026
Close: Feb 3, 2026
Renovation (replacement of) title flooring through the building, interior painting and renovation of men's, women's and staff restrooms at cove senior center. Removal of old light fixtures and replacement of new LED light fixtures.
AvailableProject consists of approx. Renovation of a 20,000 SF 2-Story 1938 Historic Armory to enhance its resilience against future floods and disasters. Constructed with masonry, steel, and wood, the exterior scope will include replacing the roof, repairing masonry walls, replacing windows and doors, and adding new lighting. The 14,400 SF main level interior renovation will include new masonry walls, refurbished restrooms and kitchen, new resilient finishes, new fire sprinkler system, and new mechanical, electrical, and plumbing systems. The 5,600 SF upper level will mostly remain unchanged and left unoccupied for public use. New mechanical, electrical, and plumbing equipment will be located here with some modifications to infill discarded openings and add new utility access.
Posted Date
Nov 12, 2025
Due Date
Feb 19, 2026
Release: Nov 12, 2025
Close: Feb 19, 2026
Project consists of approx. Renovation of a 20,000 SF 2-Story 1938 Historic Armory to enhance its resilience against future floods and disasters. Constructed with masonry, steel, and wood, the exterior scope will include replacing the roof, repairing masonry walls, replacing windows and doors, and adding new lighting. The 14,400 SF main level interior renovation will include new masonry walls, refurbished restrooms and kitchen, new resilient finishes, new fire sprinkler system, and new mechanical, electrical, and plumbing systems. The 5,600 SF upper level will mostly remain unchanged and left unoccupied for public use. New mechanical, electrical, and plumbing equipment will be located here with some modifications to infill discarded openings and add new utility access.
AvailableThe City of Irving is soliciting competitive sealed bids for the Heritage Senior Center Courtyard Renovation Project (066LF-26F), a construction contract funded in whole or in part by HUD Community Development Block Grant (CDBG) funds to renovate the courtyard with new pavement, synthetic turf, picnic shelter, shade canopy, outdoor kitchen, fire pit, lighting and associated work. The solicitation requires compliance with applicable HUD and federal requirements (including Davis-Bacon wage determinations), includes mandatory pre-bid attendance options, and the City strongly encourages electronic bid submission; plans, technical specs, geotechnical report, and other bid documents are posted on the City’s procurement portal (login required). The opportunity was posted on 2026-01-23 and the bid deadline is 2026-02-10 at 2:00 PM CT; the posting is an active single-solicitation detail page on the City of Irving procurement site as of 2026-01-24.
Posted Date
Jan 23, 2026
Due Date
Feb 10, 2026
Release: Jan 23, 2026
Close: Feb 10, 2026
The City of Irving is soliciting competitive sealed bids for the Heritage Senior Center Courtyard Renovation Project (066LF-26F), a construction contract funded in whole or in part by HUD Community Development Block Grant (CDBG) funds to renovate the courtyard with new pavement, synthetic turf, picnic shelter, shade canopy, outdoor kitchen, fire pit, lighting and associated work. The solicitation requires compliance with applicable HUD and federal requirements (including Davis-Bacon wage determinations), includes mandatory pre-bid attendance options, and the City strongly encourages electronic bid submission; plans, technical specs, geotechnical report, and other bid documents are posted on the City’s procurement portal (login required). The opportunity was posted on 2026-01-23 and the bid deadline is 2026-02-10 at 2:00 PM CT; the posting is an active single-solicitation detail page on the City of Irving procurement site as of 2026-01-24.
AvailableRemodeling of portions of the interior and exterior of the light rail training center (LRTC) building. The scope of the phase 2 project is as follows: remodel the east half of the building, including adding additional restrooms, training rooms, exits, and other support spaces, including all architectural, structural, mechanical and electrical work required. Provide and install windows on the south side of the building. Provide finishes to the east half of the building. Remodel select areas of the west half of the building as indicated on the drawings. Repair the exterior façade and paint. Add parking lot on the west side of the site and update stormwater access. Add the parking along the road between the balloon tracks. Add/modify sidewalks and paved areas around the existing building. Update parking in front of the building for accessibility. Extend and expand the existing HVAC system including ductwork and adding an additional mechanical unit. Extend power, data, and life safety systems into the remodeled areas of the building. Contaminated soil removal in the area of the parking lot as defined in the attached limited phase II drilling investigation.
Posted Date
Jul 15, 2025
Due Date
Jan 29, 2026
Release: Jul 15, 2025
Close: Jan 29, 2026
Remodeling of portions of the interior and exterior of the light rail training center (LRTC) building. The scope of the phase 2 project is as follows: remodel the east half of the building, including adding additional restrooms, training rooms, exits, and other support spaces, including all architectural, structural, mechanical and electrical work required. Provide and install windows on the south side of the building. Provide finishes to the east half of the building. Remodel select areas of the west half of the building as indicated on the drawings. Repair the exterior façade and paint. Add parking lot on the west side of the site and update stormwater access. Add the parking along the road between the balloon tracks. Add/modify sidewalks and paved areas around the existing building. Update parking in front of the building for accessibility. Extend and expand the existing HVAC system including ductwork and adding an additional mechanical unit. Extend power, data, and life safety systems into the remodeled areas of the building. Contaminated soil removal in the area of the parking lot as defined in the attached limited phase II drilling investigation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →