Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consist of approx 2,386 SY remove asphalt pavement; 10,932 CY general excavation; 4,320 LF temporary silt fencing; 916 LF 15" RCP/RPVCP storm drain pipe; 30 LF 30" reinforced concrete pipe; 735 LF cleaning existing pipes; 665.9 SY 8" thick concrete drive.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 10,932 CY general excavation; 3 CY embankment; 4,320 LF temporary silt fencing; 1,491.1 SY class ii base course (5" thick) (asphalt concrete base); 373.9000 SY class ii base course (8" thick) (crushed stone, recycled portland cement concrete, blended calcium sulfate); 798.1000 TN asphalt concrete; 866.7000 SY portland cement concrete pavement (10" thick); 916 LF storm drain pipe (15" RCP/rpvcp); 1,443 LF shoulder underdrain system; 50 LF guard rail transitions (double thrie beam); 91.1000 SY incidental concrete paving (4" thick); 658.4000 LF combination concrete curb & gutter; 247. 7700 LF temporary pavement markings (8" width).
Posted Date
Jan 19, 2026
Due Date
Jan 22, 2026
Release: Jan 19, 2026
Close: Jan 22, 2026
Work includes 10,932 CY general excavation; 3 CY embankment; 4,320 LF temporary silt fencing; 1,491.1 SY class ii base course (5" thick) (asphalt concrete base); 373.9000 SY class ii base course (8" thick) (crushed stone, recycled portland cement concrete, blended calcium sulfate); 798.1000 TN asphalt concrete; 866.7000 SY portland cement concrete pavement (10" thick); 916 LF storm drain pipe (15" RCP/rpvcp); 1,443 LF shoulder underdrain system; 50 LF guard rail transitions (double thrie beam); 91.1000 SY incidental concrete paving (4" thick); 658.4000 LF combination concrete curb & gutter; 247. 7700 LF temporary pavement markings (8" width).
AvailableRichland County is soliciting electronic sealed bids for construction of a 5-lane roadway (four 12-foot travel lanes separated by a 15-foot median) from Shop Road (SC 768) to Garners Ferry Road (US 76), including bike lanes, sidewalks, drainage, paving, culverts, signage, signals, and related earthwork and erosion control. The procurement is an Invitation for Bid (sealed bid) with a non-mandatory pre-bid meeting scheduled and questions due prior to the bid deadline. Bids must be submitted electronically via the Richland County procurement portal; the Downloads section lists a Project Manual (primary solicitation document).
Posted Date
Jan 16, 2026
Due Date
Feb 18, 2026
Release: Jan 16, 2026
Close: Feb 18, 2026
Richland County is soliciting electronic sealed bids for construction of a 5-lane roadway (four 12-foot travel lanes separated by a 15-foot median) from Shop Road (SC 768) to Garners Ferry Road (US 76), including bike lanes, sidewalks, drainage, paving, culverts, signage, signals, and related earthwork and erosion control. The procurement is an Invitation for Bid (sealed bid) with a non-mandatory pre-bid meeting scheduled and questions due prior to the bid deadline. Bids must be submitted electronically via the Richland County procurement portal; the Downloads section lists a Project Manual (primary solicitation document).
AvailableProject includes all materials, equipment, transportation and labor necessary to reconstruct Alice’s Road, from south of Dellwood Drive to south of Douglas Parkway, from a two-lane rural section to a four-lane boulevard section including PCC pavement, PCC trail and pedestrian ramps. Project items include subgrade preparation and treatment, PCC roadway paving, trail and ramp paving, pavement markings, storm sewer installation, water main installation, Joint Utility Trench (JUT) installation, traffic control, erosion control, landscaping, plantings, and surface restoration. Specific project location along with the kind and approximate quantity of materials to be used shall be as set forth in the Plans and Specifications.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Project includes all materials, equipment, transportation and labor necessary to reconstruct Alice’s Road, from south of Dellwood Drive to south of Douglas Parkway, from a two-lane rural section to a four-lane boulevard section including PCC pavement, PCC trail and pedestrian ramps. Project items include subgrade preparation and treatment, PCC roadway paving, trail and ramp paving, pavement markings, storm sewer installation, water main installation, Joint Utility Trench (JUT) installation, traffic control, erosion control, landscaping, plantings, and surface restoration. Specific project location along with the kind and approximate quantity of materials to be used shall be as set forth in the Plans and Specifications.
AvailableWork includes 1 LS clearing and grubbing; 1 LS excavation and embankment; 20 CY traffic maintenance aggregate; 225 SY portland cement concrete pavement (8" thick); 940 LF storm drain pipe (15" pp); 5 EA catch basin (cb-06); 1 EA adjusting manholes; 410 SY concrete walk (4" thick); 6 EA handicapped curb ramps; 139 LF concrete curb (barrier); 760 LF combination concrete curb and gutter (barrier and mountable); 55 SY rip rap (55 lb, 24" thick); 1,600 SY slab sodding (centipede); 24 SF sign (type a); 15 LF plastic pavement striping (12" width) (thermoplastic 90 mil); 1,200 SY 2" thick asphaltic concrete pavement (binder course).
Posted Date
Jan 9, 2026
Due Date
Feb 12, 2026
Release: Jan 9, 2026
Close: Feb 12, 2026
Work includes 1 LS clearing and grubbing; 1 LS excavation and embankment; 20 CY traffic maintenance aggregate; 225 SY portland cement concrete pavement (8" thick); 940 LF storm drain pipe (15" pp); 5 EA catch basin (cb-06); 1 EA adjusting manholes; 410 SY concrete walk (4" thick); 6 EA handicapped curb ramps; 139 LF concrete curb (barrier); 760 LF combination concrete curb and gutter (barrier and mountable); 55 SY rip rap (55 lb, 24" thick); 1,600 SY slab sodding (centipede); 24 SF sign (type a); 15 LF plastic pavement striping (12" width) (thermoplastic 90 mil); 1,200 SY 2" thick asphaltic concrete pavement (binder course).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis