Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 10,932 CY general excavation; 3 CY embankment; 4,320 LF temporary silt fencing; 1,491.1 SY class ii base course (5" thick) (asphalt concrete base); 373.9000 SY class ii base course (8" thick) (crushed stone, recycled portland cement concrete, blended calcium sulfate); 798.1000 TN asphalt concrete; 866.7000 SY portland cement concrete pavement (10" thick); 916 LF storm drain pipe (15" RCP/rpvcp); 1,443 LF shoulder underdrain system; 50 LF guard rail transitions (double thrie beam); 91.1000 SY incidental concrete paving (4" thick); 658.4000 LF combination concrete curb & gutter; 247. 7700 LF temporary pavement markings (8" width).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work consist of approx 2,386 SY remove asphalt pavement; 10,932 CY general excavation; 4,320 LF temporary silt fencing; 916 LF 15" RCP/RPVCP storm drain pipe; 30 LF 30" reinforced concrete pipe; 735 LF cleaning existing pipes; 665.9 SY 8" thick concrete drive.
Posted Date
Dec 20, 2024
Due Date
Jan 22, 2026
Release: Dec 20, 2024
Close: Jan 22, 2026
The work consist of approx 2,386 SY remove asphalt pavement; 10,932 CY general excavation; 4,320 LF temporary silt fencing; 916 LF 15" RCP/RPVCP storm drain pipe; 30 LF 30" reinforced concrete pipe; 735 LF cleaning existing pipes; 665.9 SY 8" thick concrete drive.
AvailableWork includes 1 LS clearing and grubbing; 1 LS excavation and embankment; 20 CY traffic maintenance aggregate; 225 SY portland cement concrete pavement (8" thick); 940 LF storm drain pipe (15" pp); 5 EA catch basin (cb-06); 1 EA adjusting manholes; 410 SY concrete walk (4" thick); 6 EA handicapped curb ramps; 139 LF concrete curb (barrier); 760 LF combination concrete curb and gutter (barrier and mountable); 55 SY rip rap (55 lb, 24" thick); 1,600 SY slab sodding (centipede); 24 SF sign (type a); 15 LF plastic pavement striping (12" width) (thermoplastic 90 mil); 1,200 SY 2" thick asphaltic concrete pavement (binder course).
Posted Date
Jan 9, 2026
Due Date
Feb 12, 2026
Release: Jan 9, 2026
Close: Feb 12, 2026
Work includes 1 LS clearing and grubbing; 1 LS excavation and embankment; 20 CY traffic maintenance aggregate; 225 SY portland cement concrete pavement (8" thick); 940 LF storm drain pipe (15" pp); 5 EA catch basin (cb-06); 1 EA adjusting manholes; 410 SY concrete walk (4" thick); 6 EA handicapped curb ramps; 139 LF concrete curb (barrier); 760 LF combination concrete curb and gutter (barrier and mountable); 55 SY rip rap (55 lb, 24" thick); 1,600 SY slab sodding (centipede); 24 SF sign (type a); 15 LF plastic pavement striping (12" width) (thermoplastic 90 mil); 1,200 SY 2" thick asphaltic concrete pavement (binder course).
Seeking construction services for the Kellogg Hollow Road Phase II project, including excavation, embankment, rock work, drainage culvert installation, SRA buried structure, CSBC, CSTC, BST surfacing, guardrail, and striping on approximately 2.10 miles of road.
Posted Date
Jan 8, 2026
Due Date
Feb 9, 2026
Release: Jan 8, 2026
Close: Feb 9, 2026
Seeking construction services for the Kellogg Hollow Road Phase II project, including excavation, embankment, rock work, drainage culvert installation, SRA buried structure, CSBC, CSTC, BST surfacing, guardrail, and striping on approximately 2.10 miles of road.
AvailableThe Housing Authority of Jefferson Parish is requesting proposals for Phase I Demolition and Abatement Services at its Acre Road Site. Proposals are due by 2:00 p.m. CST on January 26, 2026, with a pre‑proposal meeting scheduled for January 7, 2026 at 10:00 a.m. CST. Bid documents are available through the City Blueprint Plans planroom.
Posted Date
Dec 24, 2025
Due Date
Jan 26, 2026
Release: Dec 24, 2025
Close: Jan 26, 2026
The Housing Authority of Jefferson Parish is requesting proposals for Phase I Demolition and Abatement Services at its Acre Road Site. Proposals are due by 2:00 p.m. CST on January 26, 2026, with a pre‑proposal meeting scheduled for January 7, 2026 at 10:00 a.m. CST. Bid documents are available through the City Blueprint Plans planroom.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis