Summary
The project is for replacement of submarine power cables (2) and submarine control cables (2) between Pier E and Pier F of the Bridge. Additionally, a submarine fiber optic cable is to be installed between Pier E and Pier F of the Bridge. The submarine cables shall be armored for underwater installation in a trench at a depth of five (5) feet below the bottom of the navigable channel. The armored cables are terminated in boxes located six (6 ft.) above the 100-year flood level as shown in the plans. The cables continue up each pier, from the termination boxes, in PVC coated rigid galvanized steel conduit to the regulator rooms and control rooms in each tower. Power cables are terminated in the regulator rooms and control rooms in each tower. Control cables are terminated in the control rooms within each tower. The fiber optic cable is terminated in the control rooms within each tower.