Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The improvements under this contract consist of raised pedestrian crossings, pedestrian hybrid beacons, raised intersections, milling and resurfacing, curb and gutter, sidewalk, drainage improvements, signal improvements, lighting, and signing and pavement markings. & The improvements under this Contract consist of milling and resurfacing, curb ramps (ADA), and pavement marking. See attached file for full scope.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Resurface 0.29 miles of State Route 184 by removing the existing wearing course, performing necessary pavement repairs, resurfacing, installation of sidewalk and PED ramps.
Posted Date
Jan 9, 2026
Due Date
Feb 3, 2026
Release: Jan 9, 2026
Close: Feb 3, 2026
Resurface 0.29 miles of State Route 184 by removing the existing wearing course, performing necessary pavement repairs, resurfacing, installation of sidewalk and PED ramps.
AvailableThe project consists of approx 5,600 LF of road rehabilitation; 16,205 SY of asphaltic milling; 8,100 SY of asphaltic base patching; 55 storm and sanitary structure adjustments; 1,825 LF of new storm sewer; 30 LF of storm sewer replacement; 3,930 tons of asphaltic pavement; 6,000 SY of lawn restoration.
Posted Date
Jan 7, 2026
Due Date
Jan 29, 2026
Release: Jan 7, 2026
Close: Jan 29, 2026
The project consists of approx 5,600 LF of road rehabilitation; 16,205 SY of asphaltic milling; 8,100 SY of asphaltic base patching; 55 storm and sanitary structure adjustments; 1,825 LF of new storm sewer; 30 LF of storm sewer replacement; 3,930 tons of asphaltic pavement; 6,000 SY of lawn restoration.
AvailableProject consists of the reconstruction and resurfacing of road include hot-mix asphalt milling and resurfacing, pavement removal, curb and gutter removal and replacement, driveway removal and replacement, drainage structure adjustments/reconstructions and installations, storm sewer/structure removal, storm sewer installation, underdrains, earth excavation, class D patching, pavement striping and related work.
Posted Date
Dec 18, 2025
Due Date
Jan 12, 2026
Release: Dec 18, 2025
Close: Jan 12, 2026
Project consists of the reconstruction and resurfacing of road include hot-mix asphalt milling and resurfacing, pavement removal, curb and gutter removal and replacement, driveway removal and replacement, drainage structure adjustments/reconstructions and installations, storm sewer/structure removal, storm sewer installation, underdrains, earth excavation, class D patching, pavement striping and related work.
Provide planing, resurfacing, traffic signal backplate upgrades, and traffic stripe.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Provide planing, resurfacing, traffic signal backplate upgrades, and traffic stripe.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →