Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The improvements under this contract consist of but not limited to: construction of lighting improvements (including installation of new light poles, luminaire retrofits, placement of conduits, pull boxes, pole cable distribution, and conductors), installation of roadway and bridge connection guardrails, milling and resurfacing, installation of a high-friction surface, bridge expansion joint replacements and miscellaneous concrete repairs, sod restoration, and signing and pavement markings along an existing freeway ramp. See attached file for full scope.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bridge deck overlay - prestressed concrete bulb-t beam; bridge deck overlay - post-tensioned concrete box girder; bridge deck overlay - composite continuous steel beam.
Posted Date
Dec 17, 2025
Due Date
Feb 11, 2026
Release: Dec 17, 2025
Close: Feb 11, 2026
Bridge deck overlay - prestressed concrete bulb-t beam; bridge deck overlay - post-tensioned concrete box girder; bridge deck overlay - composite continuous steel beam.
AvailableThe work consist of approx 5,904 SY bridge floor overlay; 391 SY bridge floor repair; 1,829.10 SY longitudinal grooving in concrete; 1,200 LF temporary barrier rail.
Posted Date
Nov 18, 2025
Due Date
Feb 14, 2026
Release: Nov 18, 2025
Close: Feb 14, 2026
The work consist of approx 5,904 SY bridge floor overlay; 391 SY bridge floor repair; 1,829.10 SY longitudinal grooving in concrete; 1,200 LF temporary barrier rail.
AvailableWork consists of: pavement removal, 948 SY; curb, concrete, remove, 20LF; linear grading, 262.50 LF; subgrade treatment, Type IC, 494 SY; milling, asphalt, 1 1/2-IN, 4636 SY; lean concrete base, 9-IN, 468 SY; terminal joint, retrofit polymer modified asphalt, 3032 SF; joints in PCCP, saw and seal, 4093 LF; guardrail, remove, 237 LF; guardrail height transition, MGS, 3 EA; milled HMA corrugations, conventional, 1120 LF; mulched seeding, Type R, 276 SY; sodding, 22 SY; reinforcing bars, epoxy coated, 30371 lbs; concrete bridge railing transition, type TFT, 4 EA; pipe, Type 4, circular, diameter 6-IN, 120 LF; concrete anchor, diameter 24-IN, 1 EA; temporary worksite speed limit sign assembly, continuous, 60 EA.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Work consists of: pavement removal, 948 SY; curb, concrete, remove, 20LF; linear grading, 262.50 LF; subgrade treatment, Type IC, 494 SY; milling, asphalt, 1 1/2-IN, 4636 SY; lean concrete base, 9-IN, 468 SY; terminal joint, retrofit polymer modified asphalt, 3032 SF; joints in PCCP, saw and seal, 4093 LF; guardrail, remove, 237 LF; guardrail height transition, MGS, 3 EA; milled HMA corrugations, conventional, 1120 LF; mulched seeding, Type R, 276 SY; sodding, 22 SY; reinforcing bars, epoxy coated, 30371 lbs; concrete bridge railing transition, type TFT, 4 EA; pipe, Type 4, circular, diameter 6-IN, 120 LF; concrete anchor, diameter 24-IN, 1 EA; temporary worksite speed limit sign assembly, continuous, 60 EA.
Bridge deck rehabilitation.
Posted Date
Oct 21, 2025
Due Date
Jan 30, 2026
Release: Oct 21, 2025
Close: Jan 30, 2026
Bridge deck rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis