Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge deck overlay continuous reinforced concrete slab; hma overlay, preventive maintenance and culvert replacements; bridge deck overlay continuous steel beam; lighting installation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Hma overlay, preventive maintenance - guardrail, stormwater, full & partial depth hma patching, asphalt milling, asphalt for tack coat, guardrail, pavement marking, and signage.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Hma overlay, preventive maintenance - guardrail, stormwater, full & partial depth hma patching, asphalt milling, asphalt for tack coat, guardrail, pavement marking, and signage.
AvailableHma overlay, preventive maintenance and pipe lining - excavation, stormwater, asphalt milling, full depth & partial depth hma patching, partial depth joint repair, pavement marking, saw cut for roadway loop detector and sealant, pavement marking.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Hma overlay, preventive maintenance and pipe lining - excavation, stormwater, asphalt milling, full depth & partial depth hma patching, partial depth joint repair, pavement marking, saw cut for roadway loop detector and sealant, pavement marking.
AvailableHMA overlay, structural - excavation, stormwater, compacted aggregate, asphalt milling, asphalt for tack coat, chain link fence, concrete sidewalk, water main connections, water service connection, gate valve with valve box, 8" DI water main, sanitary sewer pipe, water meter relocate, manhole, fire hydrant assembly, pavement marking, & signs.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
HMA overlay, structural - excavation, stormwater, compacted aggregate, asphalt milling, asphalt for tack coat, chain link fence, concrete sidewalk, water main connections, water service connection, gate valve with valve box, 8" DI water main, sanitary sewer pipe, water meter relocate, manhole, fire hydrant assembly, pavement marking, & signs.
Available8.78 mil gross of HMA designed overlay and installation of four foot HMA safety shoulders along with edge line rumble strips. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
8.78 mil gross of HMA designed overlay and installation of four foot HMA safety shoulders along with edge line rumble strips. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis