Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of: excavation, common, 3204 CY; linear grading, 9724 LF; HMA patching, full depth, Type C, 162TN; HMA patching, partial depth, Type C, 27TN; HMA patching, partial depth, Type D, 2314 TN; milling, asphalt, 1 1/2-IN, 24794 SY; milling, asphalt, 2-IN, 350454 SY; milled HMA corrugations, conventional, 159454 LF; construction sign, Type A 123 EA; line, multi-component, solid, white, 6-IN, 89834 LF; line, multi-component, solid, yellow, 6-IN, 89834 LF; temporary pavement marking, removable, 6-IN, 21280 SF; barricade, Type III-A 72. LF; PCCP patching, full depth, 235 SY; transverse marking, thermoplastic, crosshatch line, white, 24-IN, 1026 LF.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of: remove sidewalk concrete, 155 SY; common excavation, 33 CY; subgrade treatment, Type II, 56 SY; structure backfill, Type 1, 83 CY; HMA patching, full depth, Type B, 11 TN; compacted aggregate, no. 53, 4 CY; asphalt milling, 1 1/2-IN, 2225 SY; joint adhesive, 2790 LF; concrete sidewalk, 96 SY; riprap, revetment, 25 TN; sodding, nursery, 356 SY; HMA for structure installation, Type B, 6 TN; sodding, nursery, 356 SY; HMA for structure installation, Type B, 6 TN; video inspection for pipe, 303 LF; construction sign, Type B, 1 EA; barricade, Type III-A, 36 LF; 152 LF, transverse marking, paint, parking line, white, 4-IN, 760 LF.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Work consists of: remove sidewalk concrete, 155 SY; common excavation, 33 CY; subgrade treatment, Type II, 56 SY; structure backfill, Type 1, 83 CY; HMA patching, full depth, Type B, 11 TN; compacted aggregate, no. 53, 4 CY; asphalt milling, 1 1/2-IN, 2225 SY; joint adhesive, 2790 LF; concrete sidewalk, 96 SY; riprap, revetment, 25 TN; sodding, nursery, 356 SY; HMA for structure installation, Type B, 6 TN; sodding, nursery, 356 SY; HMA for structure installation, Type B, 6 TN; video inspection for pipe, 303 LF; construction sign, Type B, 1 EA; barricade, Type III-A, 36 LF; 152 LF, transverse marking, paint, parking line, white, 4-IN, 760 LF.
AvailableWork includes 10 CY of common excavation; 12,557 SY of milling, asphalt, 1 1/2"; 127 SY of milling, approach; 6,889 LF of void reducing asphalt membrane for hma; 30 LF of reseting guardrail; 48 SY of mulched seeding, type u; 5,764 LF of temporary pavement marking, removable, 6"; 274 LF of temporary pedestrian channelizer; 7618 LF of line, multi-component, solid, white, 6".
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Work includes 10 CY of common excavation; 12,557 SY of milling, asphalt, 1 1/2"; 127 SY of milling, approach; 6,889 LF of void reducing asphalt membrane for hma; 30 LF of reseting guardrail; 48 SY of mulched seeding, type u; 5,764 LF of temporary pavement marking, removable, 6"; 274 LF of temporary pedestrian channelizer; 7618 LF of line, multi-component, solid, white, 6".
Work consists of: pipe abandon and grout fill, 23 LF; catch basin, remove, 1 EA; pipe, remove, 165 LF; excavation, common, 435 SY; stormwater management implementation, 1 LS; subgrade treatment, Type II, 469 SY; structure backfill, Type 2, 54 CY; HMA patching, full depth, Type B, 129 TN; milling, asphalt, 1 1/4-IN, 3462 SY; asphalt for tack coat, 3996 SY; fence, chain link, reset, 140 LF; parking barrier, concrete, 4 EA; 12 TN, riprap, revetment; fertilizer for permanent seeding, 1 TN; mulched seeding, Type U, 727 SY; sodding, nursery, 339 SY; PCCP for structure installation, 5 SY; barricade, Type III-A, 48 LF.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Work consists of: pipe abandon and grout fill, 23 LF; catch basin, remove, 1 EA; pipe, remove, 165 LF; excavation, common, 435 SY; stormwater management implementation, 1 LS; subgrade treatment, Type II, 469 SY; structure backfill, Type 2, 54 CY; HMA patching, full depth, Type B, 129 TN; milling, asphalt, 1 1/4-IN, 3462 SY; asphalt for tack coat, 3996 SY; fence, chain link, reset, 140 LF; parking barrier, concrete, 4 EA; 12 TN, riprap, revetment; fertilizer for permanent seeding, 1 TN; mulched seeding, Type U, 727 SY; sodding, nursery, 339 SY; PCCP for structure installation, 5 SY; barricade, Type III-A, 48 LF.
HMA overlay, preventive maintenance; small structure replacement -culvert; ADA sidewalk ramp construction; traffic signals modernization.
Posted Date
Jan 16, 2026
Due Date
Feb 11, 2026
Release: Jan 16, 2026
Close: Feb 11, 2026
HMA overlay, preventive maintenance; small structure replacement -culvert; ADA sidewalk ramp construction; traffic signals modernization.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis