Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
HMA overlay, preventive maintenance; small structure replacement -culvert; ADA sidewalk ramp construction; traffic signals modernization.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bridge deck overlay continuous reinforced concrete slab; hma overlay, preventive maintenance and culvert replacements; bridge deck overlay continuous steel beam; lighting installation.
Posted Date
Dec 17, 2025
Due Date
Feb 11, 2026
Release: Dec 17, 2025
Close: Feb 11, 2026
Bridge deck overlay continuous reinforced concrete slab; hma overlay, preventive maintenance and culvert replacements; bridge deck overlay continuous steel beam; lighting installation.
AvailableWork consists of: remove sidewalk concrete, 155 SY; common excavation, 33 CY; subgrade treatment, Type II, 56 SY; structure backfill, Type 1, 83 CY; HMA patching, full depth, Type B, 11 TN; compacted aggregate, no. 53, 4 CY; asphalt milling, 1 1/2-IN, 2225 SY; joint adhesive, 2790 LF; concrete sidewalk, 96 SY; riprap, revetment, 25 TN; sodding, nursery, 356 SY; HMA for structure installation, Type B, 6 TN; sodding, nursery, 356 SY; HMA for structure installation, Type B, 6 TN; video inspection for pipe, 303 LF; construction sign, Type B, 1 EA; barricade, Type III-A, 36 LF; 152 LF, transverse marking, paint, parking line, white, 4-IN, 760 LF.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Work consists of: remove sidewalk concrete, 155 SY; common excavation, 33 CY; subgrade treatment, Type II, 56 SY; structure backfill, Type 1, 83 CY; HMA patching, full depth, Type B, 11 TN; compacted aggregate, no. 53, 4 CY; asphalt milling, 1 1/2-IN, 2225 SY; joint adhesive, 2790 LF; concrete sidewalk, 96 SY; riprap, revetment, 25 TN; sodding, nursery, 356 SY; HMA for structure installation, Type B, 6 TN; sodding, nursery, 356 SY; HMA for structure installation, Type B, 6 TN; video inspection for pipe, 303 LF; construction sign, Type B, 1 EA; barricade, Type III-A, 36 LF; 152 LF, transverse marking, paint, parking line, white, 4-IN, 760 LF.
AvailableProject involves pavement removal at each end for full depth concrete replacement, leveling HMA, HMA interlayer, surface HMA, granular shoulders and pavement markings.
Posted Date
Jan 13, 2026
Due Date
Mar 9, 2026
Release: Jan 13, 2026
Close: Mar 9, 2026
Project involves pavement removal at each end for full depth concrete replacement, leveling HMA, HMA interlayer, surface HMA, granular shoulders and pavement markings.
AvailableWork consists of: excavation, common, 3204 CY; linear grading, 9724 LF; HMA patching, full depth, Type C, 162TN; HMA patching, partial depth, Type C, 27TN; HMA patching, partial depth, Type D, 2314 TN; milling, asphalt, 1 1/2-IN, 24794 SY; milling, asphalt, 2-IN, 350454 SY; milled HMA corrugations, conventional, 159454 LF; construction sign, Type A 123 EA; line, multi-component, solid, white, 6-IN, 89834 LF; line, multi-component, solid, yellow, 6-IN, 89834 LF; temporary pavement marking, removable, 6-IN, 21280 SF; barricade, Type III-A 72. LF; PCCP patching, full depth, 235 SY; transverse marking, thermoplastic, crosshatch line, white, 24-IN, 1026 LF.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Work consists of: excavation, common, 3204 CY; linear grading, 9724 LF; HMA patching, full depth, Type C, 162TN; HMA patching, partial depth, Type C, 27TN; HMA patching, partial depth, Type D, 2314 TN; milling, asphalt, 1 1/2-IN, 24794 SY; milling, asphalt, 2-IN, 350454 SY; milled HMA corrugations, conventional, 159454 LF; construction sign, Type A 123 EA; line, multi-component, solid, white, 6-IN, 89834 LF; line, multi-component, solid, yellow, 6-IN, 89834 LF; temporary pavement marking, removable, 6-IN, 21280 SF; barricade, Type III-A 72. LF; PCCP patching, full depth, 235 SY; transverse marking, thermoplastic, crosshatch line, white, 24-IN, 1026 LF.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis