SAP-35(77) - Construction of 0.179 Miles of Bridge and Approaches On the Old Jackson Road RFP
1. 000 ls, clearing and grubbing; 1. 000 ls, removal of bridge at sta. 20+17. 00; 17. 000 lf, removal of pipe (all sizes)
Description: The improvements under this contract consist of roadway and pavement reconstruction, guardrail, drainage improvements, removal signing and pavement markings.
SpecialDistrict · FL, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CountyMS
Posted
-
Sep 30, 2026
1. 000 ls, clearing and grubbing; 1. 000 ls, removal of bridge at sta. 20+17. 00; 17. 000 lf, removal of pipe (all sizes)
Florida Department of Transportation
Special DistrictFL
Posted
Aug 28, 2026
Sep 30, 2026
The improvements under this contract consist of bridge replacement, milling and resurfacing, drainage, guardrail and signing and pavement markings.
Florida Department of Transportation
Special DistrictFL
Posted
Aug 28, 2026
Sep 30, 2026
Contract consist of replacing the existing low-level bridge including piles, approach slabs and slope protection. Roadway approach reconstruction using asphalt pavement, type e curb and gutter, and guardrail.
Florida Department of Transportation
Special DistrictFL
Posted
Aug 28, 2026
Sep 30, 2026
Contract consist of replacing the existing low-level bridge including piles, approach slabs and slope protection. Roadway approach reconstruction using asphalt pavement, type e curb and gutter, and guardrail.
Decision makers connected to this RFP from Florida Department of Transportation.