CountyAL
-
Closes
Aug 26, 2026
Baldwin County Resurfacing Projects 2026: Group # 3/BCR-2026-3
The estimated total tonnage of bituminous plant mix for Group 3 is approx. 22640+/- tons.
Description: Spokane County is soliciting bids for stormwater package 3 construction projects at five locations, including 5 Mile Grange, Lloyd Street Part 2, Casper Drive–Hangman Valley Road, and 5602 Willamette Street. The work includes installing perforated pipes, catch basins, and cross culverts, along with removing and replacing curb and asphalt. The solicitation is an Invitation for Bid, with work required before October 31, 2026 and 20 working days allowed for completion.
County · WA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyAL
-
Closes
Aug 26, 2026
The estimated total tonnage of bituminous plant mix for Group 3 is approx. 22640+/- tons.
CityPA
Jul 24, 2026
Closes
Aug 18, 2026
Installation of two stormwater bumpouts, curb and sidewalk replacement, and a new curb ramp within the public right-of-way in Borough.
CountyWI
Jan 27, 2022
Closes
Aug 31, 2026
Construction projects over the course of 2026.
CityVT
Aug 11, 2026
Closes
Aug 28, 2026
The Town of Essex is soliciting bids for the 2026 Stonebrook Stormwater Pond Maintenance project. The work includes dewatering the retention pond as necessary, removing sediment within the plan boundaries, and transporting the excavated material to a designated area. Sealed bids are due at 10:00 AM on August 28, 2026, and the work must be completed by October 2, 2026.
Procurement and program contacts connected to Spokane County.