Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of Electrical power modification and replacement at Alvardo wastewater treatment plant. Replacement of existing 480V swithboard no 3. Replacement of 480V motor control center no 25. Re-feed of 480V power from SWBD-3
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Wastewater treatment plant motor control center replacement. Removal and disposal of existing motor control center, installation of a new motor control center with an elevated galvanized steel platform, and application of floor coating system.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Wastewater treatment plant motor control center replacement. Removal and disposal of existing motor control center, installation of a new motor control center with an elevated galvanized steel platform, and application of floor coating system.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform switchboard upgrades at Harrison High School.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
Perform switchboard upgrades at Harrison High School.
AvailableThe project involves the following descriptions of work: replace three existing 50 hp pump and motor assemblies with new 60 hp submersible units in the existing mls#4 dry pit, remove and replace associated electrical components, including conduit, wiring, disconnects, and control panels, valves and fittings.
Posted Date
Dec 16, 2025
Due Date
Feb 10, 2026
Release: Dec 16, 2025
Close: Feb 10, 2026
The project involves the following descriptions of work: replace three existing 50 hp pump and motor assemblies with new 60 hp submersible units in the existing mls#4 dry pit, remove and replace associated electrical components, including conduit, wiring, disconnects, and control panels, valves and fittings.
AvailableWalla Walla Community College (WWCC) is soliciting bids for replacement of motor control centers (MCCs) in Building D, with a base bid for MCC-B4 and four additive alternates for MCCs B1, B2, B3 and B5. The procurement is an RFB (lump-sum single-prime contract) administered by the Washington State Department of Enterprise Services (DES) with a pre-bid walkthrough scheduled for Jan 20, 2026 and bidder questions due Jan 26, 2026. Sealed bids are due Feb 5, 2026 at 1:00 PM PST and the project includes schedule, bonding, prevailing wage, and diverse business participation requirements.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Walla Walla Community College (WWCC) is soliciting bids for replacement of motor control centers (MCCs) in Building D, with a base bid for MCC-B4 and four additive alternates for MCCs B1, B2, B3 and B5. The procurement is an RFB (lump-sum single-prime contract) administered by the Washington State Department of Enterprise Services (DES) with a pre-bid walkthrough scheduled for Jan 20, 2026 and bidder questions due Jan 26, 2026. Sealed bids are due Feb 5, 2026 at 1:00 PM PST and the project includes schedule, bonding, prevailing wage, and diverse business participation requirements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.