Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Minnesota Department of Natural Resources (DNR) is seeking construction services for the redevelopment of the Swan Lake Public Water Access, encompassing clearing, grading, surfacing, and construction of a toilet screen and marine boat ramp. This project, State Project No. 2026-512-8W263, has an estimated value between $500,000 and $1,500,000 and includes preferences for targeted groups. The solicitation was posted on January 5, 2026, with responses due by January 20, 2026, via a password-protected QuestCDN posting, and no public PDF is available.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Water Activities Management Plan for White Rock Lake and Bachman Lake.
Posted Date
Dec 4, 2025
Due Date
Jan 9, 2026
Release: Dec 4, 2025
Close: Jan 9, 2026
Water Activities Management Plan for White Rock Lake and Bachman Lake.
Consulting services for the creation of a comprehensive Downtown Redevelopment Master Plan.
Posted Date
Dec 11, 2025
Due Date
Jan 30, 2026
Release: Dec 11, 2025
Close: Jan 30, 2026
Consulting services for the creation of a comprehensive Downtown Redevelopment Master Plan.
AvailableThe USDA Forest Service issued RFQ/Synopsis 1284LM26Q0003 for snow removal services at the Swan Guard Station in the Swan Lake Ranger District, Lake County, Montana. The procurement is a small-business set-aside (NAICS 561730) and will be evaluated on a Lowest Price Technically Acceptable (LPTA) basis; work includes plowing access road and clearing a parking area, responding within 24 hours of COR notification, and providing necessary equipment. The opportunity was posted Dec 17, 2025 and is open through the response deadline of Jan 7, 2026.
Posted Date
Dec 17, 2025
Due Date
Jan 8, 2026
Release: Dec 17, 2025
Close: Jan 8, 2026
The USDA Forest Service issued RFQ/Synopsis 1284LM26Q0003 for snow removal services at the Swan Guard Station in the Swan Lake Ranger District, Lake County, Montana. The procurement is a small-business set-aside (NAICS 561730) and will be evaluated on a Lowest Price Technically Acceptable (LPTA) basis; work includes plowing access road and clearing a parking area, responding within 24 hours of COR notification, and providing necessary equipment. The opportunity was posted Dec 17, 2025 and is open through the response deadline of Jan 7, 2026.
Work includes: Install two cleanouts for buried sanitary sewer lake-line at 2 Enatai Drive (private property within a sewer easement) to provide access for O&M crews to jet the lake-line in both directions when blockages occur; replace sewer mainline piping and connections to the lake-line; replace sewer manhole and install cleanout access vault; install temporary coffer dam around the in-water work area, followed by de-fishing of the work zone prior to construction; design and install sewer bypass system; temporary dock removal and restoration post sewer installation; and temp removal and restoration of affected structures, including bulkhead walls, timber fences, and grass lawns, to restore site to original condition.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
Work includes: Install two cleanouts for buried sanitary sewer lake-line at 2 Enatai Drive (private property within a sewer easement) to provide access for O&M crews to jet the lake-line in both directions when blockages occur; replace sewer mainline piping and connections to the lake-line; replace sewer manhole and install cleanout access vault; install temporary coffer dam around the in-water work area, followed by de-fishing of the work zone prior to construction; design and install sewer bypass system; temporary dock removal and restoration post sewer installation; and temp removal and restoration of affected structures, including bulkhead walls, timber fences, and grass lawns, to restore site to original condition.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis