Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Consists of the construction of the following items: asphalt grinding; pavement patch repair; asphalt concrete pavement placement; pavement marking; traffic control;
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Oregon Department of Transportation (ODOT) is soliciting quotes for planning services for project K23252 SW Allen Blvd: SW Murray Blvd - SW King Ave. The procurement is being conducted via ODOT's Master Blanket Selection Process (BVA/RFQ) and requires standard quote attachments such as a cover sheet, key staff resumes, and project samples. The solicitation was made available on 2026-01-09 and has a bid opening (submission deadline) on 2026-01-30, so it was open/active as of 2026-01-13.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
The Oregon Department of Transportation (ODOT) is soliciting quotes for planning services for project K23252 SW Allen Blvd: SW Murray Blvd - SW King Ave. The procurement is being conducted via ODOT's Master Blanket Selection Process (BVA/RFQ) and requires standard quote attachments such as a cover sheet, key staff resumes, and project samples. The solicitation was made available on 2026-01-09 and has a bid opening (submission deadline) on 2026-01-30, so it was open/active as of 2026-01-13.
AvailablePavement rehabilitation. Construction of pavement reconstruction, traffic control, and traffic striping.
Posted Date
Dec 23, 2025
Due Date
Jan 28, 2026
Release: Dec 23, 2025
Close: Jan 28, 2026
Pavement rehabilitation. Construction of pavement reconstruction, traffic control, and traffic striping.
AvailableDESIGN BUILD services for the pavement rehabilitation. The project length is approx. 3.9 miles, which includes 3.4 miles of pavement rehabilitation. Definable features of work include asphalt milling and resurfacing, bridge joint rehabilitation, drainage & lighting improvements, erosion & sediment control, roadway pavement markings and maintenance of traffic (MOT).
Posted Date
Dec 7, 2025
Due Date
Mar 3, 2026
Release: Dec 7, 2025
Close: Mar 3, 2026
DESIGN BUILD services for the pavement rehabilitation. The project length is approx. 3.9 miles, which includes 3.4 miles of pavement rehabilitation. Definable features of work include asphalt milling and resurfacing, bridge joint rehabilitation, drainage & lighting improvements, erosion & sediment control, roadway pavement markings and maintenance of traffic (MOT).
AvailableThe City of King (King City), CA is soliciting bids for the 2025 CDBG Pavement Rehabilitation Project to perform pavement rehabilitation on several street segments, including digouts, adjustment of utility covers, cold planing, HMA leveling and surface courses, cape seal, striping, and markings. The project is funded by a Community Development Block Grant (CDBG) and must comply with applicable federal and state provisions, including prevailing wage and bonding requirements; contract time is 40 working days from notice to proceed. Bids were posted with an open date of 2025-12-22 and a close date of 2026-02-05 (the posting was last updated 2025-12-24), and contact for the bid is Octavio Hurtado (ohurtado@kingcity.com, 831-385-3281 ext 5927).
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
The City of King (King City), CA is soliciting bids for the 2025 CDBG Pavement Rehabilitation Project to perform pavement rehabilitation on several street segments, including digouts, adjustment of utility covers, cold planing, HMA leveling and surface courses, cape seal, striping, and markings. The project is funded by a Community Development Block Grant (CDBG) and must comply with applicable federal and state provisions, including prevailing wage and bonding requirements; contract time is 40 working days from notice to proceed. Bids were posted with an open date of 2025-12-22 and a close date of 2026-02-05 (the posting was last updated 2025-12-24), and contact for the bid is Octavio Hurtado (ohurtado@kingcity.com, 831-385-3281 ext 5927).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →