Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN BUILD services for the pavement rehabilitation. The project length is approx. 3.9 miles, which includes 3.4 miles of pavement rehabilitation. Definable features of work include asphalt milling and resurfacing, bridge joint rehabilitation, drainage & lighting improvements, erosion & sediment control, roadway pavement markings and maintenance of traffic (MOT).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide services related to fiber infrastructure including DESIGN BUILD, project management, maintenance, and material procurement.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Provide services related to fiber infrastructure including DESIGN BUILD, project management, maintenance, and material procurement.
AvailableDESIGN-BUILD. Seeking qualified design build firms for the garcia creek drainage improvements. The project generally includes creek channel stabilization, erosion control, structural improvements, and related drainage infrastructure within the city. Placement of rock riprap and construction of rock check dams. Construction of concrete drop structures and a stilling basin.
Posted Date
Jan 21, 2026
Due Date
Mar 2, 2026
Release: Jan 21, 2026
Close: Mar 2, 2026
DESIGN-BUILD. Seeking qualified design build firms for the garcia creek drainage improvements. The project generally includes creek channel stabilization, erosion control, structural improvements, and related drainage infrastructure within the city. Placement of rock riprap and construction of rock check dams. Construction of concrete drop structures and a stilling basin.
AvailableDESIGN-BUILD: Design and construction services for the Women's Community Correctional Center-Kitchen expansion and related improvements.
Posted Date
Nov 7, 2025
Due Date
Mar 27, 2026
Release: Nov 7, 2025
Close: Mar 27, 2026
DESIGN-BUILD: Design and construction services for the Women's Community Correctional Center-Kitchen expansion and related improvements.
AvailableWork includes the pavement rehabilitation for taxiway a and some of its connectors between taxiway a1 and taxiway a5. The project also includes the relocation of some taxiway connectors in order to prevent the aircraft's direct access from the ramp to the runway, a safety requirement to prevent runway incursion by the federal aviation administration. Additionally, the project includes the construction of an aircraft holding bay. The construction work includes asphalt pavement mill and overlay, removal of existing asphalt pavement, construction of new asphalt pavement, clearing and grubbing, excavation, hauling, grading, drainage, sodding, marking, lighting, and signage.
Posted Date
Jan 13, 2026
Due Date
Feb 13, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes the pavement rehabilitation for taxiway a and some of its connectors between taxiway a1 and taxiway a5. The project also includes the relocation of some taxiway connectors in order to prevent the aircraft's direct access from the ramp to the runway, a safety requirement to prevent runway incursion by the federal aviation administration. Additionally, the project includes the construction of an aircraft holding bay. The construction work includes asphalt pavement mill and overlay, removal of existing asphalt pavement, construction of new asphalt pavement, clearing and grubbing, excavation, hauling, grading, drainage, sodding, marking, lighting, and signage.
Available