Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes mobilization 1 LS; project temporary traffic control 1 LS; HMA cl 1/2" PG 64-22 155 ton; 2" depth temporary trench restoration 541 SY; solid wall PVC storm sewer pipe 8" dia 82 LF; 48" dia concrete sewer manholes 3 EA; concrete manholes, sanitary sewer saddle manhole 1 EA; transition manhole 1 EA; abandon existing manholes 2 EA; abandon existing sanitary sewer pipe 1 LS; catch basin 1 EA; trench safety system 973 LF; removal and replacement of unsuitable material 10 CY; connection to existing water main 3 EA; cut, plug, and abandon water main 1 ls; 8" diam DI small fitting w/ joint restraints 4 EA; 8" dia DI large fitting w/ joint restraints 2 EA. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide bridge replacement, a 30'-0" long by 30'-6" wide single span continuous concrete slab bridge will replace the existing 20' long by 20' wide single span timber beam bridge with timber abutments that also includes 592 CY excavation, class 10, roadway & borrow; 261 CY excavation, class 13, channel; 1 LS removal of existing bridge; 118 CY excavation, class 23; 25,992 LB reinforcing steel, epoxy coated; 154 CY structural concrete (bridge). See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 27, 2026
Release: Dec 18, 2025
Close: Jan 27, 2026
Provide bridge replacement, a 30'-0" long by 30'-6" wide single span continuous concrete slab bridge will replace the existing 20' long by 20' wide single span timber beam bridge with timber abutments that also includes 592 CY excavation, class 10, roadway & borrow; 261 CY excavation, class 13, channel; 1 LS removal of existing bridge; 118 CY excavation, class 23; 25,992 LB reinforcing steel, epoxy coated; 154 CY structural concrete (bridge). See attached file.
AvailableThe City of Farley, Iowa is soliciting bids for the 3rd Avenue SW Reconstruction project. The advertisement lists a posting date of January 8, 2026 with bids due January 29, 2026. The project is a public works roadway reconstruction effort, not a grant program.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
The City of Farley, Iowa is soliciting bids for the 3rd Avenue SW Reconstruction project. The advertisement lists a posting date of January 8, 2026 with bids due January 29, 2026. The project is a public works roadway reconstruction effort, not a grant program.
AvailableWork consists of mechanical, electrical, plumbing, and fire protection (MEP).
Posted Date
Oct 6, 2025
Due Date
Jan 14, 2026
Release: Oct 6, 2025
Close: Jan 14, 2026
Work consists of mechanical, electrical, plumbing, and fire protection (MEP).
AvailableReplacing approx. 1000 LF of underground steam and pumped condensate lines and four new steam pits. Steam and pumped condensate laterals to Champion Hall, Science Building, and CPS will be upgraded. Install approx. 1200 LF of primary and signal duct bank along side existing duct bank distribution system. Extend existing underground chilled water distribution system for approx. 900 LF, upgrade chilled water lateral to CPS.
Posted Date
Oct 6, 2025
Due Date
Jan 29, 2026
Release: Oct 6, 2025
Close: Jan 29, 2026
Replacing approx. 1000 LF of underground steam and pumped condensate lines and four new steam pits. Steam and pumped condensate laterals to Champion Hall, Science Building, and CPS will be upgraded. Install approx. 1200 LF of primary and signal duct bank along side existing duct bank distribution system. Extend existing underground chilled water distribution system for approx. 900 LF, upgrade chilled water lateral to CPS.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis