Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide pump station expansion. The project includes the following work: replacement of the six (6) existing pumps with six (6) new dry-pit submersible type pumps; demolition of the existing chemical feed tank, system, and pumps and installation of a new chemical feed tank, system, and pumps; demolition of the existing seal water system; rehabilitation of the existing diversion structure; new electrical equipment (including variable frequency drives, control panels, switchboard, motor control centers, etc. ) associated with the proposed installation; installation of an owner-furnished programmable logic controller (PLC); demolition and expansion into the footprint of the existing chemical room to house additional electrical equipment. Miscellaneous structural, architectural, and other modifications to accommodate the listed improvements. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide Influent Pump Station Expansion Project CM/GC. Construction Manager / General Contractor (“CM/GC”) delivery method to integrate design and construction planning, improve risk management, and maintain operational continuity during construction. The CM/GC will first perform pre-construction services, then, upon agreement of a Guaranteed Maximum Price (“GMP”), may proceed to construction under a contract amendment.
Posted Date
Dec 4, 2025
Due Date
Jan 29, 2026
Release: Dec 4, 2025
Close: Jan 29, 2026
Provide Influent Pump Station Expansion Project CM/GC. Construction Manager / General Contractor (“CM/GC”) delivery method to integrate design and construction planning, improve risk management, and maintain operational continuity during construction. The CM/GC will first perform pre-construction services, then, upon agreement of a Guaranteed Maximum Price (“GMP”), may proceed to construction under a contract amendment.
AvailableConstruction of the addition of a third skid-mounted package water booster pump and motor similar to the two existing pumps, a new motor control center with improved interoperability with the city's scada system at the city's existing booster pump station
Posted Date
Dec 19, 2025
Due Date
Feb 10, 2026
Release: Dec 19, 2025
Close: Feb 10, 2026
Construction of the addition of a third skid-mounted package water booster pump and motor similar to the two existing pumps, a new motor control center with improved interoperability with the city's scada system at the city's existing booster pump station
AvailableWork related to the stormwater pump station includes installing new stormwater pumps, influent manholes, wetwell, additional manholes, platform, gravity storm drain, outfall, and other site improvements and civil work. Work related to the wastewater pump station includes installing new wastewater pumps, influent manhole, wetwell, valve vault, flow meter vault, new force main and other site improvements and civil work. It is anticipated stormwater pump station work to occur first and the wastewater pump station to follow
Posted Date
Dec 18, 2025
Due Date
Feb 2, 2026
Release: Dec 18, 2025
Close: Feb 2, 2026
Work related to the stormwater pump station includes installing new stormwater pumps, influent manholes, wetwell, additional manholes, platform, gravity storm drain, outfall, and other site improvements and civil work. Work related to the wastewater pump station includes installing new wastewater pumps, influent manhole, wetwell, valve vault, flow meter vault, new force main and other site improvements and civil work. It is anticipated stormwater pump station work to occur first and the wastewater pump station to follow
Work includes construction of a new stormwater pump station to replace the existing wetwell within the pump station, installing a new wetwell with submersible pumps and a controls building, new trash rack, piles, along with mechanical, electrical, and civil work, including installation of owner supplied equipment.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Work includes construction of a new stormwater pump station to replace the existing wetwell within the pump station, installing a new wetwell with submersible pumps and a controls building, new trash rack, piles, along with mechanical, electrical, and civil work, including installation of owner supplied equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis