Retrieving RFP details
Release
Close
Coordinating Research Council, Inc.
Provide services for "sustainable biomass availability for existing refinery ".
CRC-RFP-SM-F-2023-2-GHG-Quant-of-OilGas-1
Alaska Area Native Health Service
Work includes the construction of a biomass heating system complete with chip feed system (with a frame supported membrane structure for storage of the chips) to serve the water treatment plant and school. The contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all work required by these specifications and as shown on the drawings and shall have experience with constructing and installing biomass boilers; biomass boiler energy system with chip feed system with frame supported membrane structure, including construction of a gravel pad, biomass boiler modules, arctic pipelines (to provide service to the nulato water treatment plant and k-12 school), and upgrades to the end-user hydronic systems. See attached file.
Idaho Operations Office
Provide transforming biomass preprocessing for advanced gasification.
Idaho Operations Office
Open source software: LIGGGHTS-INL: pioneering biomass feedstock handling with advanced particle simulation.
Release
Sep 29, 2025
Close
Nov 07, 2025