Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Port St. Joe
Work includes surface water treatment plant micro membrane filter modules.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Palm Beach County
Provide design-build services for water treatment plant no. 8 membrane expansion.
Posted Date
Oct 5, 2024
Due Date
Dec 3, 2025
Release: Oct 5, 2024
Palm Beach County
Close: Dec 3, 2025
Provide design-build services for water treatment plant no. 8 membrane expansion.
AvailableCity of Lexington
The furnishing, and construction work at the existing water treatment plant including the installation of filter under drains, new media, air scour system, piping, values, electrical, and all other appurtenances as shown and specified in the construction documents.
Posted Date
Oct 22, 2025
Due Date
Nov 18, 2025
Release: Oct 22, 2025
City of Lexington
Close: Nov 18, 2025
The furnishing, and construction work at the existing water treatment plant including the installation of filter under drains, new media, air scour system, piping, values, electrical, and all other appurtenances as shown and specified in the construction documents.
Village of Barrington
Project consist of Iron Filter Replacement in Water Treatment Plant; see outside links for more details.
Posted Date
Oct 30, 2025
Due Date
Dec 9, 2025
Release: Oct 30, 2025
Village of Barrington
Close: Dec 9, 2025
Project consist of Iron Filter Replacement in Water Treatment Plant; see outside links for more details.
AvailableCity of Sunrise
Work consists of, but not limited to, the rehabilitation of the existing filtration system by replacing the filter underdrain, filter media, launder troughs, air scour delivery system within the underdrain, providing new positive displacement air scour blowers, placement of a crystalline coating system to address leaks in the concrete structure, and the addition of piping within the filter influent flume and other identified surfaces. New chemical injection points and piping will be provided at the clearwell.Other rehabilitation replacements include providing new valves and electric actuators to replace existing. The Human Machine Interface (HMI) on the existing filter control panel, electrical panels within the electrical room, turbidity instruments, filter box level indicators, and pressure head monitoring are to be replaced as well. Within the blower and electrical room, the doors shall be replaced and include landing pads to address existing drainage related sloping issues.
Posted Date
Oct 29, 2025
Due Date
Nov 26, 2025
Release: Oct 29, 2025
City of Sunrise
Close: Nov 26, 2025
Work consists of, but not limited to, the rehabilitation of the existing filtration system by replacing the filter underdrain, filter media, launder troughs, air scour delivery system within the underdrain, providing new positive displacement air scour blowers, placement of a crystalline coating system to address leaks in the concrete structure, and the addition of piping within the filter influent flume and other identified surfaces. New chemical injection points and piping will be provided at the clearwell.Other rehabilitation replacements include providing new valves and electric actuators to replace existing. The Human Machine Interface (HMI) on the existing filter control panel, electrical panels within the electrical room, turbidity instruments, filter box level indicators, and pressure head monitoring are to be replaced as well. Within the blower and electrical room, the doors shall be replaced and include landing pads to address existing drainage related sloping issues.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis