Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work includes, but is not limited to: Selective Demolition, Abatement, Interior finishes, finish carpentry, architectural woodwork, and built-in casework, Conveying systems, including elevator equipment, elevator cabs, and miscellaneous accessories, HVAC equipment, controls, testing, adjusting, & balancing, Building Management System work, Mechanical connections to equipment furnished by others, Electrical power & distribution, electrical connections to equipment furnished by others, Lighting, and Fire Alarm work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes doors and hardware replacement including asbestos abatement and hazardous materials abatement.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Work includes doors and hardware replacement including asbestos abatement and hazardous materials abatement.
AvailableThe State College Area School District is soliciting proposals for asbestos abatement and hazardous materials removal at the Fairmont Ave Building, 411 S. Fraser Street, State College, Pennsylvania.
Posted Date
Dec 16, 2025
Due Date
Jan 19, 2026
Release: Dec 16, 2025
Close: Jan 19, 2026
The State College Area School District is soliciting proposals for asbestos abatement and hazardous materials removal at the Fairmont Ave Building, 411 S. Fraser Street, State College, Pennsylvania.
AvailableWork includes complete heater replacement, abatement of existing flooring, new bedroom flooring installation, new corridor carpet installation, and kitchen renovations.
Posted Date
Sep 5, 2025
Due Date
Jan 21, 2026
Release: Sep 5, 2025
Close: Jan 21, 2026
Work includes complete heater replacement, abatement of existing flooring, new bedroom flooring installation, new corridor carpet installation, and kitchen renovations.
AvailableGainesville Regional Utilities (GRU) seeks sealed bids for demolition, full asbestos abatement, lead-based paint and hazardous materials removal, and site restoration for multiple downtown Gainesville structures. The contractor must provide all labor, equipment, permitting, disposal, documentation, and ensure compliance with EPA, OSHA, Florida DEP and other applicable regulations; a mandatory pre-proposal/site visit is scheduled. This is an Invitation for Bid (ITB 2026-019) with questions due January 14, 2026 and responses due January 30, 2026.
Posted Date
Dec 4, 2025
Due Date
Jan 30, 2026
Release: Dec 4, 2025
Close: Jan 30, 2026
Gainesville Regional Utilities (GRU) seeks sealed bids for demolition, full asbestos abatement, lead-based paint and hazardous materials removal, and site restoration for multiple downtown Gainesville structures. The contractor must provide all labor, equipment, permitting, disposal, documentation, and ensure compliance with EPA, OSHA, Florida DEP and other applicable regulations; a mandatory pre-proposal/site visit is scheduled. This is an Invitation for Bid (ITB 2026-019) with questions due January 14, 2026 and responses due January 30, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis