Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Milwaukee Metropolitan Sewerage District
Work includes approx. Removal of all excess liquid from both the containment tank, floor sump, and sulfuric acid piping. Cleaning of all adjacent surfaces and all associated piping to ensure complete removal of solids and any sulfuric acid residues. Proper removal and disposal of the sulfuric acid storage tank. Grating removal/replacement and installation of new support beams where grating is damaged. See outside link for more details.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of San Diego
Requires bulk delivery of Sulfuric Acid in 93% concentration, on an as-needed basis, to the North City Pure Water Facility (NCPWF) for pH adjustment in the Reverse Osmosis (RO) and Ultraviolet/Advanced Oxidation Process (UV/AOP) feed water and to neutralize high pH cleaning solutions prior to discharge.
Posted Date
Oct 24, 2025
Due Date
Nov 19, 2025
Release: Oct 24, 2025
City of San Diego
Close: Nov 19, 2025
Requires bulk delivery of Sulfuric Acid in 93% concentration, on an as-needed basis, to the North City Pure Water Facility (NCPWF) for pH adjustment in the Reverse Osmosis (RO) and Ultraviolet/Advanced Oxidation Process (UV/AOP) feed water and to neutralize high pH cleaning solutions prior to discharge.
Milwaukee Metropolitan Sewerage District
Work includes approx 1 LS curb and gutter, and hot mix asphalt pavement materials and installation; 200 TN aggregate base materials and installation. See outside link.
Posted Date
Oct 28, 2025
Due Date
Dec 3, 2025
Release: Oct 28, 2025
Milwaukee Metropolitan Sewerage District
Close: Dec 3, 2025
Work includes approx 1 LS curb and gutter, and hot mix asphalt pavement materials and installation; 200 TN aggregate base materials and installation. See outside link.
AvailablePalm Beach County
Services shall include, but not be limited to, cleaning, removal and proper disposal of one (1) fluorosilicic acid chemical storage tank. 1. Provide clear access to the location where the services will be performed. 2. Pump down all re-usable product from tank, leaving less than 2" in tank.
Posted Date
Nov 12, 2025
Due Date
Dec 4, 2025
Release: Nov 12, 2025
Palm Beach County
Close: Dec 4, 2025
Services shall include, but not be limited to, cleaning, removal and proper disposal of one (1) fluorosilicic acid chemical storage tank. 1. Provide clear access to the location where the services will be performed. 2. Pump down all re-usable product from tank, leaving less than 2" in tank.
AvailableCity of Casa Grande
Water reclamation facility security upgrade.
Posted Date
Sep 2, 2025
Due Date
Dec 2, 2025
Release: Sep 2, 2025
City of Casa Grande
Close: Dec 2, 2025
Water reclamation facility security upgrade.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis