Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes subsurface explorations, including the makings of borings in soil and rock; securing samples and other work incidental.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Geotech soil subsurface explorations requirements.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Geotech soil subsurface explorations requirements.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
To perform subsurface pressure grouting and shallow subsurface polyurethane injection. The subsurface pressure grouting program is to improve the subsurface conditions by injecting cement grout to fill voids and densify the soils as noted in a cement grout injection plan to minimize the potential for future ground subsidence. The shallow subsurface polyurethane injection will be used at drainage structures, drainage pipes, box culverts, asphalt and concrete pavement areas, sidewalk areas and bridge approach slabs for the purpose of densification of subgrade, filling voids, sealing drainage structures. And realignment of surface.
Posted Date
Dec 22, 2025
Due Date
Jan 21, 2026
Release: Dec 22, 2025
Close: Jan 21, 2026
To perform subsurface pressure grouting and shallow subsurface polyurethane injection. The subsurface pressure grouting program is to improve the subsurface conditions by injecting cement grout to fill voids and densify the soils as noted in a cement grout injection plan to minimize the potential for future ground subsidence. The shallow subsurface polyurethane injection will be used at drainage structures, drainage pipes, box culverts, asphalt and concrete pavement areas, sidewalk areas and bridge approach slabs for the purpose of densification of subgrade, filling voids, sealing drainage structures. And realignment of surface.
AvailableSubsurface exploration and geotechnical assessment reporting.
Posted Date
Nov 29, 2025
Due Date
Jan 7, 2026
Release: Nov 29, 2025
Close: Jan 7, 2026
Subsurface exploration and geotechnical assessment reporting.
AvailableProcurement of Overhead/Subsurface Utility Engineering (SUE) services to accurately identify and manage subsurface utility information for highway plans, ensuring all known utilities are graphically depicted in digital and hard copy formats according to FHWA and ASCE standards.
Posted Date
Jan 30, 2026
Due Date
Mar 3, 2026
Release: Jan 30, 2026
Close: Mar 3, 2026
Procurement of Overhead/Subsurface Utility Engineering (SUE) services to accurately identify and manage subsurface utility information for highway plans, ensuring all known utilities are graphically depicted in digital and hard copy formats according to FHWA and ASCE standards.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →