Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
4 EA, tr si df 1p 50 13. 8 120/240 - 50kva. Submersible single phase solid insulation distribution transformer designed for 60 hz, 100 degree average winding rise, have 13,800 volt primary, rated 95kv bil, and 240/120 volt 3 wire subtractive polarity secondary rated for 30kv bil or installation on a 13,800 volt delta system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of a 333kVA single phase, liquid-filled, submersible (vault type), loop feed, distribution transformer.
Posted Date
Jan 7, 2025
Due Date
Feb 6, 2026
Release: Jan 7, 2025
Close: Feb 6, 2026
Procurement of a 333kVA single phase, liquid-filled, submersible (vault type), loop feed, distribution transformer.
AvailableProcurement of single phase, overhead, distribution transformers.
Posted Date
Jan 7, 2025
Due Date
Feb 6, 2026
Release: Jan 7, 2025
Close: Feb 6, 2026
Procurement of single phase, overhead, distribution transformers.
AvailableProcurement of 12 75kVA Single Phase, Overhead, Distribution Transformers with specific voltage and impedance requirements.
Posted Date
Jan 7, 2025
Due Date
Feb 6, 2026
Release: Jan 7, 2025
Close: Feb 6, 2026
Procurement of 12 75kVA Single Phase, Overhead, Distribution Transformers with specific voltage and impedance requirements.
AvailableThe City of Moreno Valley (Moreno Valley Electric Utility) is soliciting proposals for the design, manufacture, testing, delivery, and documentation of a three-phase, liquid-immersed, pad-mounted 4.5 MVA distribution transformer to interface with inverter-based power conversion equipment at 690 V nominal. The transformer shall be suitable for outdoor installation with ONAN cooling and tamper-resistant cabinets, meeting utility-grade standards. The solicitation includes pre-bid meeting information and an online Q&A period; documents and submittals are provided through the PlanetBids portal.
Posted Date
Nov 25, 2025
Due Date
Jan 23, 2026
Release: Nov 25, 2025
Close: Jan 23, 2026
The City of Moreno Valley (Moreno Valley Electric Utility) is soliciting proposals for the design, manufacture, testing, delivery, and documentation of a three-phase, liquid-immersed, pad-mounted 4.5 MVA distribution transformer to interface with inverter-based power conversion equipment at 690 V nominal. The transformer shall be suitable for outdoor installation with ONAN cooling and tamper-resistant cabinets, meeting utility-grade standards. The solicitation includes pre-bid meeting information and an online Q&A period; documents and submittals are provided through the PlanetBids portal.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis